Internal Auditors. The findings of the internal audit will be acted upon within a month of the<br />

report after consultation with the relevant units.<br />

19. External Audit. The FA<strong>PAD</strong> of C&AG will, within six months from the end of the<br />

financial year, carry out audit of the project. The Project Director, PMU will be responsible for<br />

audit follow up and taking remedial actions with the assistance from FMS and the PMU’s<br />

Program and Implementation section(s) relevant to the objections. The PMU and <strong>LGED</strong> with the<br />

help of MLGRD&C will arrange tripartite meetings to resolve outstanding audit objections<br />

within three months from the receipt of audit report and improve the internal control arrangement<br />

to prevent recurrence of issues that would trigger audit objections.<br />

Table 3.1: Audits<br />

ImplementingAgency Audit Type Auditor Deadline<br />

<strong>LGED</strong><br />

Audit of Project’s Annual Foreign Aided Project December 31<br />

Financial Statements Audit Directorate under<br />

the Comptroller and<br />

Auditor General<br />

20. Audit Objections. RTIP. All audit objections on the RTIP financial statements until 30<br />

June 2011, that were material to IDA have been satisfactorally resolved <strong>LGED</strong> has agreed to<br />

address all audit issues that might be raised by the auditors on the financial statements of RTIP<br />

for final project year- FY 2012, within three months from the receipt of the audit report.<br />

21. Measures to reduce audit objections: Based on the lessons learnt from RTIP the<br />

expected audit objections on the proposed project would betypical of an infrastructure project,<br />

which cannot be addressed by FM design itself. These can be minimized by more intensive<br />

supervision by Engineers and Supervision Consultants. The team and the <strong>LGED</strong> have agreed on<br />

a standard checklist to be designed on each Packages bill containing confirmation from the<br />

Certifying Engineer/Consultant that the certified bill is free from any irregularities of the kind<br />

mentioned in the check list.<br />

22. Project Audit Committee. In order to ensure that the audit reports generated by the<br />

Internal Audit and the External Audit of the project are reviewed and to warrant robust follow up<br />

of the audit recommendations, a Project Audit Committee (PAC) will be constituted. The Joint<br />

Secretary LGD will be in charge of or overseeing the Audits as the PAC’s chair, and an<br />

Additional Chief Engineer <strong>LGED</strong>, Audit Specialist, LGSP II LGD, and the Project Director as<br />

members. The audit committee will meet at least twice a year to review the audit reports and to<br />

follow up on audit recommendations. The Project will provide necessary secretarial and<br />

logistical support to the PAC.<br />

23. Supervision Plan. Considering that the overall risk of the project is “substantial” a<br />

supervision mission will be conducted at least every six months. The supervision mission will<br />

ensure that adequate financial management arrangements are maintained for the project, both at<br />

the PMU and the district levels. Regular reviews will be carried out to ensure that the<br />

expenditures incurred by the project remain eligible for the Bank’s funding and that IFRs are<br />