- Page 1 and 2: Document of The World Bank FOR OFFI
- Page 3 and 4: Bangladesh: Second Rural Transport
- Page 5 and 6: . . . . . . . . . PAD DATA SHEET Ba
- Page 7: . The Recipient shall not displace
- Page 11 and 12: according to police data (actual fa
- Page 13 and 14: implementation progress in the last
- Page 15 and 16: 23. Sub Component A1: Rural Roads I
- Page 17 and 18: B. Project Financing 1. Lending Ins
- Page 19 and 20: Agriculture, Water Resources and Ru
- Page 21 and 22: financing comes down to no more tha
- Page 23 and 24: Imrprovement Total/weighted average
- Page 25 and 26: 64. LGED has adequate government su
- Page 27 and 28: 74. LGED will follow the Gender Str
- Page 29 and 30: . . Annex 1: Results and Monitoring
- Page 31 and 32: All 5 shops in WMS per Growth Cente
- Page 33 and 34: ut on outputs (outcomes) in terms o
- Page 35 and 36: (v) Strengthening of LGED strategic
- Page 37 and 38: activities. Another Train-the-Train
- Page 39 and 40: Table 2.1 Detailed Project Cost Tab
- Page 41 and 42: 4. LGED started the process of sele
- Page 43 and 44: accounting systems. LGED will compl
- Page 45 and 46: Internal Auditors. The findings of
- Page 47 and 48: completed specialized training arra
- Page 49 and 50: Sl. no. Description World Bank (Pri
- Page 51 and 52: waterways component may have signif
- Page 53 and 54: in two daily Newspapers (English an
- Page 55 and 56: 56. A decision agreed with the aggr
- Page 58 and 59:
(LGED) Project Management Organogra
- Page 60 and 61:
LGED does not have adequate capacit
- Page 62 and 63:
Social and Environmental Rating Sub
- Page 64 and 65:
Overall Risk Provide adequate train
- Page 66 and 67:
• The Integrated Performance Audi
- Page 68 and 69:
capacity of FM staff, review of aud
- Page 70 and 71:
Time Focus Skills Needed Resource E
- Page 72 and 73:
strengthen governance in the rural
- Page 74 and 75:
• Monitoring and Evaluation Syste
- Page 76 and 77:
Table 6: GAAP Matrix Issues / Risk
- Page 78 and 79:
Issues / Risk Mitigating Actions to
- Page 80 and 81:
(iii) Maintainable road needs (the
- Page 82 and 83:
(iii)Ghats improvement component 18
- Page 84 and 85:
District Upazila Table 7.1: Final L
- Page 86 and 87:
District Upazila Road Code Road Nam
- Page 88 and 89:
Table 7.3: List of Candidate UNR Ro
- Page 90 and 91:
Table 7.5: List of Candidate UNR Ro
- Page 92 and 93:
District Upazila Road Code Road Nam
- Page 94 and 95:
Table 7.8: List of Candidate UZR Ro
- Page 96 and 97:
District Upazila Selected GCM Distr
- Page 98 and 99:
Table 8.1: Calculation of economic
- Page 100 and 101:
increase was reduced by half, since
- Page 102 and 103:
Table 8.4: Economic returns of upaz
- Page 104 and 105:
makes adequate allowance for the im
- Page 106 and 107:
cargo boats and an additional 20 pa
- Page 108 and 109:
ii) Measurement of Economic Costs:
- Page 110 and 111:
passenger transport cost is expecte
- Page 112 and 113:
Table 9.2: Geometric Dimension of U
- Page 114 and 115:
GROWTH CENTRE MARKETS (GCM) 14. Mar
- Page 116 and 117:
fixed monthly payments against comp
- Page 118 and 119:
10. Performance indicators and insp
- Page 120 and 121:
US$1.1 million), with a total estim
- Page 122 and 123:
Item Performance Standard Measureme
- Page 124 and 125:
Item Performance Standard Measureme
- Page 126 and 127:
Annex 11: Rural Transport Improveme
- Page 128 and 129:
accounting firm with IT experience
- Page 130 and 131:
Annex 12: Rural Water Transport Imp
- Page 132 and 133:
Project Implementation Schedule (co