River Jetties (RJ) 1,575 NCB Post 06/01/2013<br />

Growth Centre Markets (GCM) 4,688 NCB Post 06/01/2013<br />

Rural Waterways (RW)- 2 Packages 1,500 NCB Post 10/01/2013<br />

Ref<br />

No.<br />

Contract Description<br />

Table 3.5: Services<br />

Estimated Selection<br />

Cost Method<br />

(Thousand<br />

US$)<br />

Review<br />

By Bank<br />

(Prior/<br />

Post)<br />

Expected<br />

proposal<br />

Opening<br />

Date<br />

MS-1 Management Support Consultancy<br />

2,500 QCBS Prior 10/20/2012<br />

(MSC)<br />

R-1 Design and Supervision Consultancy<br />

5,000 QCBS Prior 10/09/2012<br />

(D&SC)<br />

R-2 Design and Supervision Consultancy<br />

5,000 QCBS Prior 10/09/2012<br />

(D&SC)<br />

S-1 Integrated Performance Audit Consultant 1,250 QCBS Prior 11/15/2012<br />

S-2 Capacity Building / TA: specialist(s) in<br />

Pavement Performance and Maintenance<br />

Monitoring<br />

1,270 QCBS Prior 01/15/2013<br />

Comments<br />

Note : Expected proposal Opening Date will depend on the receiving of World Bank's no<br />

objection. Maximum 08 weeks will be needed in this case upon receiving World Bank's no<br />

objection on shortlisting.<br />

Environmental and Social (including safeguards)<br />

Environmental Safeguards<br />

39. The project is classified as a Category A project, due to the complexity of environmental<br />

issues associated with waterways improvements and also the uncertainty (lack of details at<br />

project preparation) for most of the sub-projects to be implemented in the widespread project<br />

area. The policies on environment assessment (OP/BP 4.01), natural habitats (OP/BP 4.04) and<br />

physical cultural resources (OP/BP 4.11) have been triggered for the proposed operation.<br />

40. Applicable Environmental Category and Safeguard Polices. The proposed project will<br />

finance road improvement and maintenance activities on the existing rural road network. No<br />

significant and long-term environmental impact is expected from rural road improvement and<br />

maintenance subcomponents. However, works on rural roads in general have impacts resulting<br />

from erosion, dust and noise control, waste disposal during construction and increased access to<br />

remote areas. Road improvements will ensure proper drainage and enhance soil stability, as well<br />

as provide greater vehicular and pedestrian safety by improving road surfaces and embankments<br />

and building bridges. Other impacts can be managed effectively with known mitigation<br />

measures.<br />

41. The construction of the fifty (50) growth center markets will also take place in the<br />

existing market locations and no significant impact is expected from this subcomponent.<br />

However, the project will support the dredging and maintenance of two existing waterways by<br />

introducing low-impact dredging, removal of temporarily constructed earthen bunds across<br />

waterways, protection works at erosion-prone and vulnerable points along bank lines, enhancing<br />

safety by installation of navigational aids, and provision of landing facilities. The rural<br />