SUBJECT: MAKO COMPRESSOR BAC-06 SOP: 300.3.40<br />

CATEGORY: Equipment Operations PAGE: 2 of 2<br />

POST FILLING OPERATION<br />

1. After filling operation is complete, close all "FROM BANKS " and open all "TO BANKS " that need<br />

refilling. This will route air from the compressor directly to the storage cylinders, and pressure will then<br />

equalize in all storage banks. Monitor and allow the compressor to top off all storage banks to 6000 psi<br />

(compressor will shut off automatically at 6000 psi, and the high air indicator light will come on).<br />

2. When all storage banks are full, close all valves on panel. Shut off power switch.<br />

3. DO NOT OVERTIGHTEN VALVES! ONLY LIGHT PRESSURE IS NEEDED.<br />

4. IMPORTANT: DIAL REGULATOR BACK TO ZERO.<br />

rev:4/94;3/99