10.07.2015 Views

SFPUC 2001 Alameda Watershed Management Plan

SFPUC 2001 Alameda Watershed Management Plan

SFPUC 2001 Alameda Watershed Management Plan

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

III. ENVIRONMENTAL SETTING AND IMPACTSE. NATURAL RESOURCESTABLE III.E-4MANAGEMENT ACTIONS THAT COULD RESULT IN SIGNIFICANT PHYSICAL EFFECTS TO NATURAL RESOURCES FROMWATERSHED OPERATIONS, MAINTENANCE, AND CONSTRUCTION ACTIVITIES<strong>Management</strong> Actions that Could be Required to Reduce Potential Physical Effects<strong>Management</strong> Actions that Could Result inPotential Physical Effects a Action a,b Level of Significanceif ImplementedAction veg6: Identify and remove, using IPM, invasive exotic Actions veg1, veg2, veg3, veg6.1, and wil1.LTSplant speciesAction veg12: Coordinate with PG&E in clearing vegetation Actions veg1, veg2, veg3, veg6.1, and wil1. LTSAction wil5: Relocate or eliminate unnecessary infrastructure and Actions veg1, veg2, veg3, veg6.1, and wil1.LTSfacilities.Action wil7: Create palatable re-sprouting through mechanical Actions veg1, veg2, veg3, veg5.1, veg6.1, and wil1.LTStreatments or prescribed fire.Action sto1: Remediate on-site stormwater collection and Actions veg1, veg2, veg3, veg6.1, and wil1.LTSdrainage systems through infiltration drainfields and trenches, anddetention basins.Action aqu12: Install long-term sediment retention basins or Actions veg1, veg2, veg3, veg6.1, and wil1.LTSother permanent measures.Action aqu5: Rehabilitate shoreline areas using structural Actions veg1, veg2, veg3, veg6.1, and wil1.LTSshoreline protection practices.Action aqu7: Rehabilitate stream segments. Actions veg1, veg2, veg3, veg6.1, and wil1. LTSAction haz6: Identify high-risk spill potential areas andActions veg1, veg2, veg3, veg6.1, and wil1.LTSimplement measures, including barricades, to reduce the risk ofhazardous spills.Action was1: Repair/replace vault, chemical, and composting Actions veg1, veg2, veg3, veg6.1, and wil1.LTStoilet as necessary.Action roa2: Relocate existing necessary high use roads/roadsegments in proximity to streams.Actions veg1, veg2, veg3, veg6.1, and wil1.LTSa See accompanying text and Table II-1 for a description of each management action.b Bold text indicates actions that may be most essential for reducing potential significant impacts.S = SignificantPS = Potentially SignificantLTS = Less than SignificantNOP 96.223E: <strong>Alameda</strong> <strong>Watershed</strong> <strong>Management</strong> <strong>Plan</strong> III.E-26 ESA / 930385January <strong>2001</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!