10.07.2015 Views

SFPUC 2001 Alameda Watershed Management Plan

SFPUC 2001 Alameda Watershed Management Plan

SFPUC 2001 Alameda Watershed Management Plan

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

III. ENVIRONMENTAL SETTING AND IMPACTSL. NOISETABLE III.L-1 (Continued)MANAGEMENT ACTIONS THAT COULD RESULT IN SIGNIFICANT PHYSICAL EFFECTS ONNOISE LEVELS THROUGH CONSTRUCTION ACTIVITIES<strong>Management</strong> Actions that Could be Required to Reduce Potential Physical Effects<strong>Management</strong> Actions that Could Result inPotential Physical Effects a Action a,b Level of Significanceif ImplementedAction sun5: Reclaim quarries with sideslopes appropriate to NonePS, see Section IV.Ltheir proposed activity.Action sun10: Retain the existing Sunol maintenance facility with NonePS, see Section IV.Limprovements, including equipment storage shelter, warehouseand storage yard, parking, etc.Action sun11: Backfill and landscape a ¼-mile buffer zone at the NonePS, see Section IV.Lmining module closest to the Sunol Valley Water Temple,between that module and the temple.Action sun13: Restore the historic entry to the Sunol Water Temple. None PS, see Section IV.LAction sun14: Develop a public recreation area around the Sunol NonePS, see Section IV.LWater Temple.Action sun19: Establish a small commercial site. None PS, see Section IV.LAction sun20: Establish an overnight nature study area. None PS, see Section IV.LAction gra2: Implement structural protection measures, including NonePS, see Section IV.Lfencing and other improvements.Action gra6: Implement improvements for the San Antonio NonePS, see Section IV.LWater Protection Area.Action gra7: Implement improvements for the Calaveras NonePS, see Section IV.L<strong>Watershed</strong> Protection Area.Action gra8: Implement improvements for the Lower <strong>Alameda</strong> NonePS, see Section IV.LCreek <strong>Watershed</strong> Protection Area.Policy WA18.1: Consider expansion of existing golf course inareas of low vulnerability/sensitivity.NonePS, see Section IV.La See accompanying text and Table II-1 for a description of each management action.b Bold text indicates actions that may be most essential for reducing potential significant impacts.S = SignificantPS = Potentially SignificantLTS = Less than SignificantNOP 96.223E: <strong>Alameda</strong> <strong>Watershed</strong> <strong>Management</strong> <strong>Plan</strong> III.L-7 ESA / 930385January <strong>2001</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!