10.07.2015 Views

SFPUC 2001 Alameda Watershed Management Plan

SFPUC 2001 Alameda Watershed Management Plan

SFPUC 2001 Alameda Watershed Management Plan

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

III. ENVIRONMENTAL SETTING AND IMPACTSI. AESTHETICSTABLE III.I-1MANAGEMENT ACTIONS THAT COULD RESULT IN SIGNIFICANT PHYSICAL EFFECTS TO AESTHETIC QUALITYTHROUGH INSTALLATION OF NEW FACILITIES<strong>Management</strong> Actions that Could be Required to Reduce Potential Physical Effects<strong>Management</strong> Actions that Could Result inPotential Physical Effects a Action a,b Level of Significanceif ImplementedAction haz6: Identify high-risk spill potential areas andActions des5, veg1, and veg7.LTSimplement measures (e.g., fines, barricades, etc.).Action roa2: Relocate existing necessary high use roads/road Actions roa12, veg1, and veg7.LTSsegments in proximity to streams.Action roa3: Modify the grading and drainage of existing Actions roa12, veg1, and veg7.LTSnecessary high use roads/road segments.Action fir3: Install a total of four helispots on <strong>SFPUC</strong> property. Actions des5, veg1, and veg7. LTSAction fir4: Install three additional helispots on adjacent non- Actions des5, veg1, and veg7.LTS<strong>SFPUC</strong> lands.Action fir6: Install an additional water tank. Actions des5, veg1, and veg7. LTSAction fir7: Identify and construct road improvements to provide Actions roa12, veg1, and veg7.LTSbetter access.Action pub3: Establish information kiosks at <strong>Watershed</strong> Actions des5, veg1, and veg7.LTSentryways.Action pub4: Establish a <strong>Watershed</strong> Visitor Education Center. Actions des5, veg1, and veg7. LTSAction sun10: Retain the existing Sunol maintenance facility with Actions des5, veg1, and veg7.LTSimprovements, including equipment storage shelter, warehouseand storage yard, parking, etc.Action sun11: Backfill and landscape a ¼-mile buffer zone at the Actions des5, veg1, and veg7.LTSmining module closest to the Sunol Water Temple, between thatmodule and the temple.Action sun13: Restore the historic entry to the Sunol WaterTemple.Actions des5, veg1, and veg7.LTSa See accompanying text and Table II-1 for a description of each management action.b Bold text indicates actions that may be most essential for reducing potential significant impacts.S = SignificantPS = Potentially SignificantLTS = Less than SignificantNOP 96.223E: <strong>Alameda</strong> <strong>Watershed</strong> <strong>Management</strong> <strong>Plan</strong> III.I-6 ESA / 930385January <strong>2001</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!