10.07.2015 Views

SFPUC 2001 Alameda Watershed Management Plan

SFPUC 2001 Alameda Watershed Management Plan

SFPUC 2001 Alameda Watershed Management Plan

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

II. PROJECT DESCRIPTIONTABLE II-1 (Continued)SUMMARY OF ALAMEDA WATERSHED MANAGEMENT ACTIONS<strong>Management</strong>Action Number 1 Summary of <strong>Management</strong> Actions 2 PotentialAdversePhysicalEffectsAnalyzedin thisProgram-Level EIRMay RequireProject-SpecificEnvironmentalReview 3inf4inf5inf6Prior to any operations and maintenance and/or construction activities, request a database checkfor any known sensitive ecological or cultural resources. (Phase A)Assign the duties of maintaining and updating the <strong>Watershed</strong> web page to an LRMS staffmember trained in web page maintenance. (Phase 1)Disseminate and acquire significant information to applicable agencies and local and regionaldatabases (e.g., California Natural Diversity Data Base). (Phase A)No No NoNo No NoNo No NoDesign and Construction Requirements (des)des1des2des2.1des3des4des5des6Meet with proponents of new plans and projects prior to detailed design or development to identifyrequirements of the <strong>Alameda</strong> <strong>Watershed</strong> <strong>Management</strong> <strong>Plan</strong> which must be met. (Phase 1A)Evaluate all proposed plans and projects as part of the Review Process for Proposed <strong>Plan</strong>s andProjects using the <strong>Watershed</strong> Goals and Policies Compliance Checklist. (Phase 1A)Prior to approval of any lease or permit involving construction or the introduction of additionalpeople into the <strong>Watershed</strong>, conduct a carrying capacity analysis. (Phase A)Assign an LRMS staff member to be the Proposed Projects Review Coordinator to oversee theReview Process for Proposed <strong>Plan</strong>s and Projects. (Phase 1)Prior to initiation of any new construction, or renovation/alteration, construct permanentperimeter fencing around the construction zone. (Phase A)Ensure design guidelines are met prior to approval of new construction activities orrenovation/alteration of existing facilities, structures and roads. (Phase A)Prior to the design and construction of new facilities and trails ensure compliance with all legallymandated accessibility standards. (Phase A)No No NoNo No NoNo No NoNo No NoNo No NoNo No NoNo No No_________________________1 Inclusion does not ensure that funding, staff, or equipment will be made available to implement these actions, nor does it obligate the <strong>SFPUC</strong> to implement actions it chooses not to.2 Phasing of the management actions is identified by one or more of the following categories: (1) Phase 1 – within 5 years of <strong>Management</strong> <strong>Plan</strong> adoption; (2) Phase 2 – within 10 years ofadoption; (3) Phase 3 – within 20 years of adoption; and/or (A) on an as-needed basis, and (B) at regular intervals throughout the life of the <strong>Management</strong> <strong>Plan</strong>.3 MEA would require examination of these actions, when proposed, to determine if further CEQA project-level environmental review of these actions were necessary.NOP 96.223E: <strong>Alameda</strong> <strong>Watershed</strong> <strong>Management</strong> <strong>Plan</strong> II-44 ESA / 930385January <strong>2001</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!