10.07.2015 Views

SFPUC 2001 Alameda Watershed Management Plan

SFPUC 2001 Alameda Watershed Management Plan

SFPUC 2001 Alameda Watershed Management Plan

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

II. PROJECT DESCRIPTIONTABLE II-1 (Continued)SUMMARY OF ALAMEDA WATERSHED MANAGEMENT ACTIONS<strong>Management</strong>Action Number 1 Summary of <strong>Management</strong> Actions 2 PotentialAdversePhysicalEffectsAnalyzedin thisProgram-Level EIRMay RequireProject-SpecificEnvironmentalReview 3sun19sun20sun21sun22Establish a small commercial site near the intersection of I-680 and Route 84 to provide limitedsupplies for visitors. (Phase 3)Establish an overnight study area located in the Sunol Valley South of Hetch Hetchy Aqueduct.(Phase 3)Establish trail connections which extend to the Sunol Regional Wilderness and also with trailconnections established north of I-680. (Phase 3)Contract with a concessionaire, proven to be competent in the development and management ofrecreation facilities, to construct and operate the Sunol Valley recreation facilities. (Phase 3A)Yes Yes YesYes Yes YesYes Yes YesNo No NoGrazing <strong>Management</strong> (gra)gra1gra2gra3Implement grazing management controls to reduce the risk of viable pathogen discharges andmaintain and improve ecological resources. (Phase 1)Implement structural protection measures to reduce the risk of viable pathogen discharges andmaintain and improve ecological resources. (Phase 1)Evaluate the feasibility and potential benefits of different types or classes of livestock forachieving fuel reduction goals. (Phase 2)No No NoYes Yes YesNo No Nogra4 Implement specific criteria for lessee selection. (Phase 1) No No Nogra5 Implement a set of lease requirements and terms. (Phase 1) No No Nogra6 Implement improvements for the San Antonio <strong>Watershed</strong> Protection Area. (Phase 1A) Yes Yes Nogra7 Implement improvements for the Calaveras <strong>Watershed</strong> Protection Area. (Phase 1A) Yes Yes Nogra8 Implement improvements for the Lower <strong>Alameda</strong> Creek <strong>Watershed</strong> Protection Area. (Phase 1) Yes Yes No_________________________1 Inclusion does not ensure that funding, staff, or equipment will be made available to implement these actions, nor does it obligate the <strong>SFPUC</strong> to implement actions it chooses not to.2 Phasing of the management actions is identified by one or more of the following categories: (1) Phase 1 – within 5 years of <strong>Management</strong> <strong>Plan</strong> adoption; (2) Phase 2 – within 10 years ofadoption; (3) Phase 3 – within 20 years of adoption; and/or (A) on an as-needed basis, and (B) at regular intervals throughout the life of the <strong>Management</strong> <strong>Plan</strong>.3 MEA would require examination of these actions, when proposed, to determine if further CEQA project-level environmental review of these actions were necessary.NOP 96.223E: <strong>Alameda</strong> <strong>Watershed</strong> <strong>Management</strong> <strong>Plan</strong> II-47 ESA / 930385January <strong>2001</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!