10.07.2015 Views

SFPUC 2001 Alameda Watershed Management Plan

SFPUC 2001 Alameda Watershed Management Plan

SFPUC 2001 Alameda Watershed Management Plan

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

III. ENVIRONMENTAL SETTING AND IMPACTSM. HAZARDOUS MATERIALS AND HAZARDOUS WASTETABLE III.M-1 (Continued)MANAGEMENT ACTIONS THAT COULD RESULT IN SIGNIFICANT PHYSICAL EFFECTS THROUGH CONSTRUCTION-RELATED EXPOSURE OF HAZARDOUS MATERIALS<strong>Management</strong> Actions that Could be Required to Reduce Potential Physical Effects<strong>Management</strong> Actions that Could Result inPotential Physical Effects a Action a,b Level of Significanceif ImplementedAction roa7: Maintain fire roads through effective installation of Actions roa12 and des9.PS, see Section IV.Mwaterbars and paving where needed.Action roa8: Restrict access on low use roads by gates or Actions roa12 and des9.PS, see Section IV.Mbarriers.Action fir2: Install a total of nine hydrants into water sources. Action des9. PS, see Section IV.MAction fir3: Install and maintain a total of four helispots on Action des9.PS, see Section IV.M<strong>SFPUC</strong> property.Action fir4: Install three additional helispots off <strong>SFPUC</strong> lands. Action des9. PS, see Section IV.MAction fir5: Install two additional hydrants on adjacent lands. Action des9. PS, see Section IV.MAction fir6: Install an additional water tank. Action des9. PS, see Section IV.MAction fir7: Identify and construct road improvements, including Action des9.PS, see Section IV.Mturnouts, turnarounds, and safety zones.Action fir8: Complete the fuel management projects, including Action des9.PS, see Section IV.Mfuel load reductions, prescribed burns, fuel breaks, and accessimprovements.Action will13: Design and install wildlife passage structures that Action des9.PS, see Section IV.Mminimize wildlife losses.Action pub3: Establish “gateway” information kiosks. Action des9. PS, see Section IV.MAction pub4: Establish a Visitor Education Center. Action des9. PS, see Section IV.MAction sun4: Create sideslopes on the quarry pits such that thereis a gradual transition to water.Action des9.PS, see Section IV.Ma See accompanying text and Table II-1 for a description of each management action.b Bold text indicates actions that may be most essential for reducing potential significant impacts.S = SignificantPS = Potentially SignificantLTS = Less than SignificantNOP 96.223E: <strong>Alameda</strong> <strong>Watershed</strong> <strong>Management</strong> <strong>Plan</strong> III.M-6 ESA / 930385January <strong>2001</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!