10.07.2015 Views

SFPUC 2001 Alameda Watershed Management Plan

SFPUC 2001 Alameda Watershed Management Plan

SFPUC 2001 Alameda Watershed Management Plan

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

III. ENVIRONMENTAL SETTING AND IMPACTSE. NATURAL RESOURCESTABLE III.E-4 (Continued)MANAGEMENT ACTIONS THAT COULD RESULT IN SIGNIFICANT PHYSICAL EFFECTS TO NATURAL RESOURCES FROMWATERSHED OPERATIONS, MAINTENANCE, AND CONSTRUCTION ACTIVITIES<strong>Management</strong> Actions that Could be Required to Reduce Potential Physical Effects<strong>Management</strong> Actions that Could Result inPotential Physical Effects a Action a,b Level of Significanceif ImplementedAction will13: Design and install wildlife passage structures that Actions veg1, veg2, veg3, veg6.1, and wil1.LTSminimize wildlife losses.Action pub3: Establish “gateway” information kiosks. Actions veg1, veg2, veg3, veg6.1, and wil1. LTSAction pub4: Establish a Visitor Education Center. Actions veg1, veg2, veg3, veg6.1, and wil1. LTSActon des8: Implement universal access improvements at <strong>SFPUC</strong> Actions veg1, veg2, veg3, veg6.1, and wil1.LTSfacilities and trails.Action sun17: Provide universal access at Sunol ValleyActions veg1, veg2, veg3, veg6.1, and wil1.LTSrecreation facilities.Action sun4: Create sideslopes on the quarry pits such that there Actions veg1, veg2, veg3, veg6.1, and wil1.LTSis a gradual transition to water.Action sun5: Reclaim quarries with sideslopes appropriate to Actions veg1, veg2, veg3, veg6.1, and wil1.LTStheir proposed activity.Action sun10: Retain the existing Sunol maintenance facility with Actions veg1, veg2, veg3, veg6.1, and wil1.LTSimprovements, including equipment storage shelter, warehouseand storage yard, parking, etc.Action sun11: Backfill and landscape a ¼-mile buffer zone at the Actions veg1, veg2, veg3, veg6.1, and wil1.LTSmining module closest to the Sunol Water Temple, between thatmodule and the water temple.Action sun13: Restore the historic entry to the Sunol Water Actions veg1, veg2, veg3, veg6.1, and wil1.LTSTemple.Action sun14: Develop a public recreation area around the Sunol Actions veg1, veg2, veg3, veg6.1, and wil1.LTSWater Temple.Action sun19: Establish a small commercial site. Actions veg1, veg2, veg3, veg6.1, and wil1. LTSa See accompanying text and Table II-1 for a description of each management action.b Bold text indicates actions that may be most essential for reducing potential significant impacts.S = SignificantPS = Potentially SignificantLTS = Less than SignificantNOP 96.223E: <strong>Alameda</strong> <strong>Watershed</strong> <strong>Management</strong> <strong>Plan</strong> III.E-28 ESA / 930385January <strong>2001</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!