10.07.2015 Views

SFPUC 2001 Alameda Watershed Management Plan

SFPUC 2001 Alameda Watershed Management Plan

SFPUC 2001 Alameda Watershed Management Plan

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

III. ENVIRONMENTAL SETTING AND IMPACTSH. CULTURAL RESOURCESTABLE III.H-3 (Continued)MANAGEMENT ACTIONS THAT COULD RESULT IN SIGNIFICANT PHYSICAL EFFECTS TO CULTURAL RESOURCESFROM OPERATIONS, MAINTENANCE, AND CONSTRUCTION ACTIVITIES<strong>Management</strong> Actions that Could be Required to Reduce Potential Physical Effects<strong>Management</strong> Actions that Could Result inPotential Physical Effects a Action a,b Level of Significanceif ImplementedAction sun10: Retain the existing Sunol maintenance facility with Actions cul1 through cul8 and Policies CR1 through CR9. PS, see Section IV.Himprovements, including equipment storage shelter, waterhouseand storage yard, parking, etc.Action sun11: Backfill and landscape a ¼-mile buffer zone at the Actions cul1 through cul8 and Policies CR1 through CR9. PS, see Section IV.Hmining module closest to the water storage pit, between thatmodule and the temple.Action sun13: Restore the historic entry to the Sunol Water Actions cul1 through cul8 and Policies CR1 through CR9. PS, see Section IV.HTemple.Action sun14: Develop a public recreation area around the Sunol Actions cul1 through cul8 and Policies CR1 through CR9. PS, see Section IV.HWater Temple.Action sun19: Establish a small commercial site. Actions cul1 through cul8 and Policies CR1 through CR9. PS, see Section IV.HAction sun20: Establish an overnight nature study area. Actions cul1 through cul8 and Policies CR1 through CR9. PS, see Section IV.HAction sun21: Establish trail connections extending to the Sunol Actions cul1 through cu18 and Policies CR1 through CR9. PS, see Section IV.HRegional Wilderness.Action gra2: Implement structural protection measures, includingfencing and other improvements.Actions cul1 through cul8 and Policies CR1 through CR9. PS, see Section IV.HAction gra6: Implement improvements for the San AntonioWater Protection Area.Action gra7: Implement improvements for the Calaveras<strong>Watershed</strong> Protection Area.Action gra8: Implement improvements for the Lower <strong>Alameda</strong>Creek <strong>Watershed</strong> Protection Area.Actions cul1 through cul8 and Policies CR1 through CR9 arerequired to reduce this impact.Actions cul1 through cul8 and Policies CR1 through CR9.Actions cul1 through cul8 and Policies CR1 through CR9.PS, see Section IV.HPS, see Section IV.HPS, see Section IV.Ha See accompanying text and Table II-1 for a description of each management action.b Bold text indicates actions that may be most essential for reducing potential significant impacts.S = SignificantPS = Potentially SignificantLTS = Less than SignificantNOP 96.223E: <strong>Alameda</strong> <strong>Watershed</strong> <strong>Management</strong> <strong>Plan</strong> III.H-14 ESA / 930385January <strong>2001</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!