30.11.2012 Views

Evaluation of the Swiss Virtual Campus - Schweizerische ...

Evaluation of the Swiss Virtual Campus - Schweizerische ...

Evaluation of the Swiss Virtual Campus - Schweizerische ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

SVC Final <strong>Evaluation</strong>. Background Report Lepori and Probst<br />

16000<br />

14000<br />

12000<br />

10000<br />

8000<br />

6000<br />

4000<br />

2000<br />

0<br />

UNIBAS<br />

UNIBE<br />

UNIFR<br />

UNIGE<br />

UNIL<br />

Figure 4. CCSP funding 2004-2007 (CHF per FTE <strong>of</strong> teachers)<br />

UNILU<br />

UNINE<br />

Source: SVC data and data from <strong>the</strong> <strong>Swiss</strong> federal statistical <strong>of</strong>fice (FTE for 2006).<br />

Personnel categories: pr<strong>of</strong>essors and o<strong>the</strong>r teachers.<br />

UNISG<br />

If we put this in a larger perspective, <strong>the</strong> role <strong>of</strong> SVC funding was relatively limited for <strong>the</strong> larger<br />

<strong>Swiss</strong> HEIs: CCSPs like those in Basel, Lausanne and Zurich have a yearly budget exceeding 1<br />

mio. CHF. Thus amounts in <strong>the</strong> order <strong>of</strong> 200,000–300,000 CHF per year – <strong>the</strong> funding received<br />

by <strong>the</strong> large universities from SVC – allowed <strong>the</strong> financing <strong>of</strong> some additional positions, but did<br />

not constitute <strong>the</strong> majority <strong>of</strong> funding <strong>of</strong> <strong>the</strong> whole CCSP. On <strong>the</strong> contrary, SVC funding was<br />

essential as seed money for <strong>the</strong> institutions which did not have a CCSP at <strong>the</strong> beginning <strong>of</strong> <strong>the</strong><br />

consolidation phase, since for example it allowed <strong>the</strong> funding <strong>of</strong> a coordinator who <strong>the</strong>n<br />

developed <strong>the</strong> whole structure; federal funding was also quite important in proportion for USI-<br />

SUPSI and for UNIFR, whose centre also hosted <strong>the</strong> Edutech mandate.<br />

The interviews showed that <strong>the</strong> end <strong>of</strong> federal funding will not raise major problems where <strong>the</strong><br />

CCSP has been well established: in all <strong>the</strong>se cases, <strong>the</strong> institutions have guaranteed <strong>the</strong> funds<br />

for <strong>the</strong> next years and most <strong>of</strong> <strong>the</strong> CCSP employees have been integrated in <strong>the</strong> permanent<br />

staff <strong>of</strong> <strong>the</strong> university. Some <strong>of</strong> <strong>the</strong> respondents clearly stated that, also for developing internal<br />

projects, money will not be a major problem if <strong>the</strong> applications <strong>of</strong> elearning are clearly useful to<br />

education. Also, <strong>the</strong>re was a fairly shared view that for <strong>the</strong> development <strong>of</strong> elearning inside <strong>the</strong><br />

universities <strong>the</strong>re will be, in <strong>the</strong> future, no major need for external funding schemes like SVC<br />

projects: many universities have introduced <strong>the</strong>ir own small-scale scheme for seed money for<br />

projects; this seems to be a preferred way. However, some <strong>of</strong> <strong>the</strong> respondents indicated that if<br />

<strong>the</strong>re is need and will to have broader elearning cooperation at national level in some specific<br />

domains, national funding would be required; it was also pointed out that some instruments<br />

already exist, like SUC cooperation projects and European projects (see chapter five for<br />

additional information).<br />

The situation concerning funding is much more difficult where <strong>the</strong> CCSP has not been<br />

established and supported actively by <strong>the</strong> rectorate, since CCSP leaders had to ask for money<br />

to replace SVC funding and had much larger difficulties; some decisions have been taken just in<br />

time for <strong>the</strong> end <strong>of</strong> federal funding (like at UNIBE), while in a few o<strong>the</strong>r cases <strong>the</strong> rectorate has<br />

yet to decide and <strong>the</strong>re is a risk that <strong>the</strong> activities will be discontinued during 2008. In <strong>the</strong>se<br />

26<br />

UZH<br />

USI<br />

SUPSI<br />

BFH<br />

FHNW<br />

FHO<br />

HSLU<br />

HES-SO<br />

ZFH

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!