30.11.2012 Views

Evaluation of the Swiss Virtual Campus - Schweizerische ...

Evaluation of the Swiss Virtual Campus - Schweizerische ...

Evaluation of the Swiss Virtual Campus - Schweizerische ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

SVC Final <strong>Evaluation</strong>. Background Report Lepori and Probst<br />

Among <strong>the</strong> activities, monitoring, SVC days, workshops and direct advice were used by most <strong>of</strong><br />

<strong>the</strong> projects, while only half <strong>of</strong> <strong>the</strong> projects used <strong>the</strong> national content server and <strong>the</strong> mandates.<br />

The projects which used <strong>the</strong>se services give a ra<strong>the</strong>r positive feedback on <strong>the</strong>m.<br />

mandates<br />

national server<br />

w orkshops<br />

SVC days<br />

direct advice from <strong>the</strong> SVC coordination<br />

project monitoring<br />

Figure 14. In which areas did you use SVC services?<br />

N = 80 (ongoing projects only)<br />

mandates<br />

national server<br />

workshops<br />

SVC days<br />

direct advice from <strong>the</strong> SVC coordination<br />

project monitoring<br />

0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100<br />

%<br />

49<br />

used did not use<br />

0% 20% 40% 60% 80% 100%<br />

very useful moderately useful not useful<br />

Figure 15. To which extent have <strong>the</strong> following activities been useful for your project?<br />

Only projects which used <strong>the</strong>se services<br />

5.2 Mandates and support services<br />

As in <strong>the</strong> impulse phase, <strong>the</strong> SVC programme has funded a number <strong>of</strong> mandate and service<br />

activities to support both CCSP and projects; however, <strong>the</strong> creation <strong>of</strong> CCSP entailed some<br />

reduction <strong>of</strong> <strong>the</strong> mandates directly targeted to <strong>the</strong> projects since this support function has been<br />

taken over by <strong>the</strong> CCSP <strong>the</strong>mselves. The following table provides a complete list <strong>of</strong> mandates<br />

for <strong>the</strong> Consolidation Programme.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!