SVC Final <strong>Evaluation</strong>. Background Report Lepori and Probst<br />
4 The SVC projects<br />
In this chapter, we provide information on <strong>the</strong> status and perspectives <strong>of</strong> <strong>the</strong> SVC-funded<br />
projects, including <strong>the</strong>ir integration in <strong>the</strong> curricula and <strong>the</strong>ir relationships with <strong>the</strong>ir CCSP.<br />
The information has been collected through <strong>the</strong> monitoring dossiers <strong>of</strong> <strong>the</strong> projects, passive<br />
participation in <strong>the</strong> monitoring visits during 2007 and two different online questionnaires: one for<br />
already concluded projects, which did not get any more federal funding, and one for projects<br />
that were still continuing in 2007, and thus had a monitoring in 2007 (ei<strong>the</strong>r in <strong>the</strong> production or<br />
maintenance phase).<br />
23 out <strong>of</strong> 26 project leaders or coordinators from concluded projects answered <strong>the</strong><br />
questionnaire (88 %), and 80 1 out <strong>of</strong> 88 ongoing projects (91 %). The total response rate is<br />
<strong>the</strong>refore 90% (103 out <strong>of</strong> 114; Table 4).<br />
1c 1m 2c 2m 3c 3m 3p 4p total<br />
not answered 2 1 1 1 4 2 11<br />
answered 11 14 11 10 1 10 18 28 103<br />
Total 13 15 12 10 1 11 22 30 114<br />
Table 4: Respondents by series 2<br />
Some information has been cross-checked with <strong>the</strong> answers <strong>of</strong> <strong>the</strong> CCSP leaders concerning<br />
<strong>the</strong>ir views on <strong>the</strong> situation and perspectives <strong>of</strong> <strong>the</strong> SVC projects.<br />
4.1 Number and status <strong>of</strong> projects<br />
Overall, <strong>the</strong> SVC has funded 112 projects divided in four series. Two more projects were funded<br />
by OPET and administratively managed by <strong>the</strong> SVC. After <strong>the</strong> end <strong>of</strong> <strong>the</strong>ir production phase, <strong>the</strong><br />
projects had <strong>the</strong> possibility <strong>of</strong> asking for a maintenance support to help <strong>the</strong>ir integration in <strong>the</strong><br />
curricula (with <strong>the</strong> exception <strong>of</strong> <strong>the</strong> 4 th series projects whose production phase ends only at <strong>the</strong><br />
end <strong>of</strong> 2007 or, for most <strong>of</strong> <strong>the</strong>m, before July 2008). Thus, <strong>the</strong>re are different situations <strong>of</strong><br />
projects to consider.<br />
Table 5 gives an overview on <strong>the</strong> projects by series and status. In 2007, 26 projects were<br />
already concluded, while 88 were still going on, 36 <strong>of</strong> <strong>the</strong>m in maintenance, 52 in production<br />
phase. While at <strong>the</strong> beginning it was foreseen that projects should be concluded at <strong>the</strong> end <strong>of</strong><br />
2007, many made use <strong>of</strong> <strong>the</strong> possibility to ask for prolongation until mid 2008 (without additional<br />
federal funding).<br />
1st 2nd 3rd 4th total<br />
Concluded 13 12 1 26<br />
Maintenance 15 10 11 3 36<br />
Production 22 30 52<br />
total 28 22 34 30 114<br />
Table 5: Projects by status and series<br />
The developed projects are not equally distributed among scientific fields (Table 6). Areas with<br />
many projects are Medicine/Pharmacy/Health, Computer Sciences/Telecommunications,<br />
Sciences/Ma<strong>the</strong>matics and Social Sciences/Social Work. Projects in Social Sciences/Social<br />
Work have been developed mainly in <strong>the</strong> consolidation phase, while <strong>the</strong> o<strong>the</strong>r fields were very<br />
active in <strong>the</strong> impulse phase as well. Architecture/Engineering is a field that started with a<br />
considerable number <strong>of</strong> projects, but <strong>the</strong>n decreased steadily.<br />
1<br />
One <strong>of</strong> <strong>the</strong>se projects answered only to half <strong>of</strong> <strong>the</strong> questions, thus in several questions we have one<br />
missing answer.<br />
2<br />
1c = first series, concluded, 1m = first series, maintenance, 3p = third series, production, etc.<br />
3 Two <strong>of</strong> <strong>the</strong>se projects are only administratively managed by <strong>the</strong> SVC coordination This raises <strong>the</strong> total<br />
number <strong>of</strong> projects to 114.<br />
29