12.07.2015 Views

PacifiCorp 2007 Integrated Resource Plan (May 30, 2007)

PacifiCorp 2007 Integrated Resource Plan (May 30, 2007)

PacifiCorp 2007 Integrated Resource Plan (May 30, 2007)

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>PacifiCorp</strong> – <strong>2007</strong> IRPChapter 7 – Modeling andSensitivity Analysis ResultsThis section presents the modeling results for the CEM sensitivity analysis studies. As a refresher,Table 7.12 repeats the sensitivity scenario specifications outlined in Chapter 6.Table 7.12 – Sensitivity Analysis ScenariosSAS# Name Basis01 <strong>Plan</strong> to 12% capacity reserve marginAlternative Futures Scenario #11("Medium Load Growth")02 <strong>Plan</strong> to 18% capacity reserve marginAlternative Futures Scenario #11("Medium Load Growth")03 CO 2 adder implementation in 2016Alternative Futures Scenario #11("Medium Load Growth")04 Regional transmission projectAlternative Futures Scenario #11("Medium Load Growth")5-105-155-20CO 2 adder impact on resource selection: test $15, $20, $25 per tonadders (approximately $10, $15, and $20 in 1990 dollars)06 Low wind capital cost07 High wind capital cost08 Low coal price09 High coal price10 Low IGCC capital cost11 High IGCC capital cost121314Add a carbon-capture-ready IGCC to the portfolio (base case forSAS13 and SAS14)Replace the IGCC resource in the SAS12 portfolio with a singlegasifierversionReplace the IGCC resource in the SAS12 portfolio with one thatincludes carbon sequestration15 <strong>Plan</strong> to "average of super-peak" load16"Favorable Wind Environment" scenario assuming permanent expirationof the renewables PTC beginning in 2008Alternative Futures Scenario #11("Medium Load Growth")Alternative Futures Scenario #11("Medium Load Growth")Alternative Futures Scenario #11("Medium Load Growth")Alternative Futures Scenario #11("Medium Load Growth")Alternative Futures Scenario #11("Medium Load Growth")Alternative Futures Scenario #11("Medium Load Growth")Alternative Futures Scenario #11("Medium Load Growth")Alternative Futures Scenario #11("Medium Load Growth")SAS #12SAS #12Alternative Futures Scenario #11("Medium Load Growth")Alternative Futures Scenario #07("Favorable Wind Environment")Table 7.13 reports the PVRR and total cumulative additions (<strong>2007</strong>–2018) by resource type forthe 16 sensitivity studies. The wind capacity contribution and average annual front office transactionsacquired for <strong>2007</strong> through 2018 are also shown. The study results are summarized below.147

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!