12.07.2015 Views

PacifiCorp 2007 Integrated Resource Plan (May 30, 2007)

PacifiCorp 2007 Integrated Resource Plan (May 30, 2007)

PacifiCorp 2007 Integrated Resource Plan (May 30, 2007)

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>PacifiCorp</strong> – <strong>2007</strong> IRPChapter 7 – Modeling andFigure 7.9 – Stochastic Mean Cost by CO 2 Adder Case23,000Stochastic Mean PVRR (Million $)22,50022,00021,50021,00020,500$0 Adder$8 Adder$15 Adder$38 Adder$61 Adder20,000RA1RA2RA3RA4RA5RA6RA7RA8RA9RA10RA11RA12It is noteworthy that the CEM’s deterministic portfolio solution without resource restrictions—Portfolio RA1—also has the lowest stochastic cost. Table 7.19 summarizes the cost impact ofconstraining CEM-selected resources in the reference portfolio according to the resource strategiesdefined for the other portfolios. The average PVRRs for the five CO 2 adder cases is used asthe cost impact measure.Table 7.19 – Cost Impact of Portfolio <strong>Resource</strong> StrategiesCost Impact Relative to PortfolioRA1ID <strong>Resource</strong> Strategy Modeled in the CEMAve. Stochastic Mean PVRR forCO 2 adder cases( Million $)RA1 Reference Case: no resource constraints (FOT capped at 1200 MW) -RA2 Remove FOT as a resource option after 2011 81RA3 Additional wind 57RA4 <strong>Plan</strong> to a 12% PRM and remove FOT after 2011 120RA5 Early SCPC and force IGCC in 2014 783RA6 Remove SCPC as a resource option 885RA7 Additional wind and remove FOT after 2011 54RA8 <strong>Plan</strong> to a 12% PRM 183RA9 Force IGCC in 2013 and 2016 651RA10 Force IGCC in 2013 and 2016; plan to 12% PRM 540RA11 Additional wind; exclude SCPC for 2012-13 and force IGCC in 2014 348RA12 Same as RA11 but plan to a 12% PRM 347163

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!