12.07.2015 Views

PacifiCorp 2007 Integrated Resource Plan (May 30, 2007)

PacifiCorp 2007 Integrated Resource Plan (May 30, 2007)

PacifiCorp 2007 Integrated Resource Plan (May 30, 2007)

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

This <strong>2007</strong> <strong>Integrated</strong> <strong>Resource</strong> <strong>Plan</strong> (IRP) Report is based upon the best available information atthe time of preparation. The IRP action plan will be implemented as described herein, but is subjectto change as new information becomes available or as circumstances change. It is <strong>PacifiCorp</strong>’sintention to revisit and refresh the IRP action plan no less frequently than annually. Any refreshedIRP action plan will be submitted to the State Commissions for their information.For more information, contact:<strong>PacifiCorp</strong>IRP <strong>Resource</strong> <strong>Plan</strong>ning825 N.E. Multnomah, Suite 600Portland, Oregon 97232(503) 813-5245IRP@<strong>PacifiCorp</strong>.comhttp://www.<strong>PacifiCorp</strong>.comThis report is printed on recycled paperCover Photos (Left to Right):Wind: Foot Creek 1Hydroelectric Generation: Yale Reservoir (Washington)Demand side management: Agricultural IrrigationThermal-Gas: Currant Creek Power <strong>Plan</strong>tTransmission: South Central Wyoming line

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!