12.07.2015 Views

PacifiCorp 2007 Integrated Resource Plan (May 30, 2007)

PacifiCorp 2007 Integrated Resource Plan (May 30, 2007)

PacifiCorp 2007 Integrated Resource Plan (May 30, 2007)

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>PacifiCorp</strong> – <strong>2007</strong> IRP Chapter 8 – Action <strong>Plan</strong>ActionItem Category Action Type16 IRP <strong>Plan</strong>ning17 IRP <strong>Plan</strong>ning18IRPAcknowledgementModeling andAnalysisModeling andAnalysisPolicy and costrecoveryCalendar-YearTiming<strong>2007</strong>-2008<strong>2007</strong>-2008<strong>2007</strong>Size(rounded tothe nearest50 MW forgenerationresources) LocationNotapplicableNotapplicableNotapplicableIRP Proxy <strong>Resource</strong>Modeled ActionSystem Not applicableSystem Not applicableSystem Not applicableContinue to investigate implications ofintegrating at least 2,000 MW of windto <strong>PacifiCorp</strong>'s systemUpdate modeling tools and assumptionsto reflect policy changes in the area ofrenewable portfolio standards andcarbon dioxide emissionsWork with states to gainacknowledgement or acceptance of the<strong>2007</strong> integrated resource plan andaction plan. To the extent state policiesresult in different acknowledged plans,work with states to achieve state policygoals in a manner that results in fullcost recovery of prudently incurredcosts227

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!