12.07.2015 Views

PacifiCorp 2007 Integrated Resource Plan (May 30, 2007)

PacifiCorp 2007 Integrated Resource Plan (May 30, 2007)

PacifiCorp 2007 Integrated Resource Plan (May 30, 2007)

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>PacifiCorp</strong> – <strong>2007</strong> IRPChapter 7 – Modeling andFigure 7.7 – Class 1 DSM Average Megawatts for Alternative Future Scenarios, <strong>2007</strong>-201625Average MW Per Program20151050East Sch.IrrigationWest Sch.IrrigationEast DLCSummerEast DLCC&IEast DLCWinterWest DLCSummerEastThermalStorageWest DLCSummerWest DLCC&IWestThermalStorageBased on these CEM results, and assuming a generic two or three-year phase-in period, Table7.15 shows the Class 1 DSM resource addition schedule for each of the risk analysis portfolios. 54Table 7.15 – Class 1 DSM Cumulative <strong>Resource</strong> Additions for Candidate PortfoliosClass 1 DSM Program LocationAnnual Cumulative Megawatt Additions(at the customer meter)2010 2011 2012 2013Summer Direct Load Control East 16 32 48Irrigation Control East 8 15Irrigation Control West 11 21 32Combined Heat and Power <strong>Resource</strong>sA fixed megawatt amount of combined heat and power (CHP) resources were included in all riskanalysis portfolios based on a review of CHP addition patterns for the alternative future scenarios.Figure 7.8 shows the megawatts selected in each of the scenarios by location. (Note that theCHP resource included in the CEM was the 25-megawatt gas-fired topping cycle unit.) Themost common resource selection pattern was 125 megawatts (100 megawatts installed in thewest side and 25 megawatts installed in the east side), which occurred for seven of the 16 scenarios.The average quantity selected for all scenarios was 90 megawatts. For 11 out of the 16 scenarios,the CHP capacity was added in 2012. Based on these results, <strong>PacifiCorp</strong> chose a CHPresource investment schedule consisting of three 25-megawatt CHP units in the west in 2012 andone 25-megawatt CHP facility in the east control area in 2012.54 Selection of DSM programs or any other resource type for the candidate portfolios should not be construed asmeaning that <strong>PacifiCorp</strong> is limiting program procurement in any way. Similarly, the resource additions schedule,including the phase-in period, is not indicative of the pace of actual program implementation once <strong>PacifiCorp</strong> identifiescost-effective programs through its procurement process.157

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!