12.07.2015 Views

PacifiCorp 2007 Integrated Resource Plan (May 30, 2007)

PacifiCorp 2007 Integrated Resource Plan (May 30, 2007)

PacifiCorp 2007 Integrated Resource Plan (May 30, 2007)

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>PacifiCorp</strong> – <strong>2007</strong> IRPChapter 7 – Modeling andFigure 7.13 – Stochastic Cost versus Risk Exposure for the $0 CO 2 Adder Case41.00$0 CO2 Adder CaseRisk Exposure: Upper-Tail StochasticMean minus Overall Mean PVRR (Billion $)39.0037.0035.0033.0031.0029.00RA6RA8RA12RA9RA4RA10RA1RA2RA3RA11RA7RA520.9 21.1 21.3 21.5 21.7 21.9 22.1Stochastic Mean PVRR (Billion $)Figure 7.14 – Stochastic Cost versus Risk Exposure for the $61 CO 2 Adder Case60.00$61 CO2 Adder CaseRisk Exposure: Upper-Tail Stochastic Meanminus Overall Mean PVRR (Billion $)58.0056.0054.0052.0050.0048.0046.00RA6RA8RA3RA1RA4RA10RA12RA9RA2RA11RA7RA521.1 21.3 21.5 21.7 21.9 22.1 22.3 22.5Stochastic Mean PVRR (Billion $)As far the resource strategies go, increasing wind capacity and reducing reliance on market purchasespromotes a better balance of portfolio cost and risk. In contrast, eliminating pulverizedcoal yields the worst cost-risk balance in all cases; this strategy yields a portfolio with bothhigher-risk and higher-cost resources.170

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!