13.07.2015 Views

columbia river basin fish and wildlife program annual ...

columbia river basin fish and wildlife program annual ...

columbia river basin fish and wildlife program annual ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

PROJECTSI. COMPLETEDNone.II. FY 1990 ONGOING PROJECTSPROJECTNUMBER TITLE OBJECTIVESSCHEDULE AND MILESTONES88-15 Mainstem Cleat-water RiverStudy: Assessment for SalmonidSpawning, Incubation, <strong>and</strong>Rearing - NPTProject Officer: J. GislasonQbiectives: Evaluate theexisting anadromous <strong>fish</strong>habitat <strong>and</strong> the temperatureregime in the lower ClearwaterRiver to determine 1) thefeasibility of establishinga run of anadromous speciesin the lower <strong>river</strong>, <strong>and</strong>2) opportunities for enhancingsteelhead rearing.Date Initiated: October 1987 1. FY 1991: Complete chinook salmon incubation,rearing, <strong>and</strong> outmigration timing studies; completeResults/Conclusions: NPT completed all data collection, data analysis, <strong>and</strong> finalPhase I of the project, a literature report.review <strong>and</strong> temperature/flow dataanalysis, <strong>and</strong> began implementing 2. FY 1991: Project scheduled for completion.Phase II field studies in FY 1989.The Phase I analysis of historicaltemperature data indicated that LowerCleat-water River temperatures aregenerally suitable for fall <strong>and</strong> summerchinook salmon reproduction. Instreamflow field measurements <strong>and</strong> preliminaryvelocity, depth, substrate, <strong>and</strong> coverpreference histograms for anadromous<strong>fish</strong> were completed in FY 1990. Resultsare available in <strong>annual</strong> report (DOE/BP-37474-l).JII. NEW PROJECTSNone.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!