13.07.2015 Views

columbia river basin fish and wildlife program annual ...

columbia river basin fish and wildlife program annual ...

columbia river basin fish and wildlife program annual ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

ADDENDUM TO FY 1991 AIWPREDUCTION LISTThe projects listed in the table below were in the Draft FY 1991 AIWP, but were recommended for deferral, modification, or deletion by thePRG to reconcile the AIWP with BPA's FY 1991 Fish <strong>and</strong> Wildlife Program budget. BPA incorporated the PRG's recommendations in the finalFY 1991 AIWP.PROJEClftPJNUMBERTITLEACTION/RATIONALEF1107 87-112Orofino Creek Passage, IdahoThe project is deferred in FY 91. Not ready for constructionin FY 91. Funds were left in FY 91 budgetfor possible trap-<strong>and</strong>-haul pre-design activities.F1113 88-160Bio-Engineering Eva1 of Oxygen SupplementationThe Michigan raceway portion of this project will bedropped. Consensus of <strong>fish</strong> culturists was that theMichigan raceway was not needed to answer questionsthat the project was intended to answer.F1113 89-06589-06689-06991-03891-039Analysis of CWT Prog Missing Production OR/WAAnalysis of CWT Prog Missing Production WAAnalysis of CWT Prog Missing Production ORAnalysis of CWT Prog Missing Production WAAnalysis of CWT Prog Missing Production OR(USFWS)(WW(ODFW)(WDW)(IFG)Ongoing projects to continue until current FY 91contracts expire; FY 91 funds deleted from BPA'sbudget. New projects deleted from FY 91 AIWP.Projects were dropped until an adequate <strong>program</strong> forcoded-wire tagging can be developed.F1113 89-099Hatchery Water Quality SurveyProject dropped in FY 91. Project not started yet.Agencies <strong>and</strong> Tribes/SG willing to drop project inFY 91.F1113 91-02191-02491-032IHN Rapid DiagnosisControl of Whirling DiseaseIHNV EvolutionDrop projects in FY 91. These were the lowest priorityprojects of the Artificial Propagation SG. Notimplementing these proposed new projects would havethe least impact. In general, research is a lowerpriority of the PRG in FY 92/93.Ad Hoc Committee (VS6-6123W)

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!