13.07.2015 Views

columbia river basin fish and wildlife program annual ...

columbia river basin fish and wildlife program annual ...

columbia river basin fish and wildlife program annual ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

4.34.3 ROZA DAM FISH PASSAGE FACILITIES(Juvenile Facilities Completion: March 1, 1987)(Adult Facilities Completion: March 1, 1988)803(b)(2)[Abstract] BPA shall fund the U.S. Bureau of Reclamation (USBR>to renovate <strong>and</strong> repair adult <strong>and</strong> juvenile <strong>fish</strong> passagefacilities at Roza Dam.ACTION ITEM ACTIVITY SUMMARY:Objectives:To fund the USBR to renovate <strong>and</strong> repair adult <strong>and</strong> juvenile <strong>fish</strong>passage facilities at Roza Dam.Background <strong>and</strong> Progress to Date:Plans:Projects:The USBR owns Roza Dam; <strong>fish</strong> passage facilities have been constructedthrough Congressional appropriations. The project is one of 20 suchpassage improvement projects in the Yakima River Basin. Fish screen<strong>and</strong> ladder improvements were required to protect juvenile <strong>fish</strong> frombeing lost in irrigation canals <strong>and</strong> to enable adult salmon <strong>and</strong>steelhead to migrate upstream to spawn. The project now providesadequate upstream <strong>and</strong> downstream <strong>fish</strong> passage, including adequatepassage during periods of reservoir drawdown.USBR began screen construction in December 1985; facilities <strong>and</strong>ladder modification construction bids were opened in August 1986.Construction of the facilities was completed in FY 1989.Action Item has been completed.No BPA-funded projects.73

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!