13.07.2015 Views

columbia river basin fish and wildlife program annual ...

columbia river basin fish and wildlife program annual ...

columbia river basin fish and wildlife program annual ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

PROJECTNUMBERP R O J E C T SCHFDULE AND MILESTONES87-413-1(TaskOrder97678)Fish Survival <strong>and</strong> SmoltPhysiology/Behavior Workshops- UW/BPNLt Officer: P. PoeDbiectiveL: Through the workshopprocess:1. Better define measurementsof salmon <strong>and</strong> steelhead smeltsurvival <strong>and</strong> smolt condition.2. Outline research needs.3. Present recommendations onhow to proceed with futuresurvival <strong>and</strong> smolt conditionresearch.4. Provide workshop results asone source of information toassist the Reservoir Mortality<strong>and</strong> Water Budget EffectivenessTechnical Work Group intheir development of a 5-yearWork Plan for mainstem passageresearch.Date Initiat.&: January 1989&ults/Concm: Proceedings fromSmolt Survival Workshop conducted Feb-ruary 1989 is available. Avenues ofresearch were identified to clarify <strong>and</strong>reduce uncertainty in survival estimates<strong>and</strong> their application in <strong>program</strong> evaluation.This project combines Project 89-50"Smoltification/Travel Time ResearchMethods Development Workshop," <strong>and</strong>Project 89-51, "Pool Survival ResearchMethod Development Workshop," that werelisted in the outline of the draft FY 1990AIWP.FY 1991: Conduct Smolt Physiology/BehaviorWorkshop that focuses on <strong>fish</strong> physiology <strong>and</strong>condition <strong>and</strong> its effect on downstream migrantbehavior.87-413-2(TaskOrder01772)Analysis of Historic Data forJuvenile <strong>and</strong> Adult Salmonids- uwProiect Officer: P. PoeDbiectives: Phase I of thiswork will assemble a data baseof statistically bounded estimatesof survival from smoltDate Initiatd: September 1989 1. FY 1991: Complete Phase I tasks: developResults/Conclusions: Report of Phase Iactivities available before end of 1990.criteria for decision to proceed to Phase II; beginPhase II if decision positive.2. FY 1992: Continue Phase II if positive resultsThis project combines Project 89-48, from evaluation of Phase I."Review <strong>and</strong> Synthesize Historical Data,"<strong>and</strong> Project 89-49, "Cohort Method <strong>and</strong>Analysis," that were listed in the outlineof the draft FY 1990 AIWP.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!