13.07.2015 Views

columbia river basin fish and wildlife program annual ...

columbia river basin fish and wildlife program annual ...

columbia river basin fish and wildlife program annual ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

PROJECTNUMBERTITLEPROJECT STATUSSCHEDULE AND MILESTONES88-141 Biological Manipulation ofMigration Rate <strong>and</strong> RecoveryRate - The Use of AdvancedPhotoperiod to AccelerateSmoltification in YearlingChinook Salmon - NMFSProiect Officer: W. MaslenDate Initiated: May 1988ResultsfConclusions: Advanced photoperiodtreatment in combination withholding <strong>fish</strong> in warmer water for aweek prior to release from DworshakHatchery results in a measurable decreasein travel time to Lower Granite,Little Goose, <strong>and</strong> McNary Dams. The 19881. FY 1991 <strong>and</strong> beyond: Anticipate advancedphotoperiod <strong>and</strong> temperature treatment experimentationat additional hatchery siteswith evaluation based on data from returningadults.2. Implement photperiod <strong>and</strong> temperature treatment,where practical, based on data fromreturning adults.Qbiectiveq: Determine the<strong>and</strong> 1989 Annual Reports are available.duration of exposure to advancedphotoperiod <strong>and</strong> temperature(before release fromthe hatchery) treatments tooptimize the migration rate ofyearling chinook through theSnake River <strong>and</strong> improve <strong>fish</strong>guiding efficiency at dams.Is089-107 Development of EpidemiologicalMethods for Use in QuantifyingSurvival Relationships fromPIT-Tag Releases of Salmon <strong>and</strong>Date Initiatd October 1989Results/Conclusions: None at this time.1. FY 1991: Complete Phase I tasks.2. FY 1991 <strong>and</strong> beyond: Proceed with Phase IIdependent upon the results of Phase I.Steelhead Smolts - UWProiect Officer: P. PoeDbiectives:1. Phase I: Develop epidemiologicalmodels <strong>and</strong> regressionestimators, tests of survivalrelationships, <strong>and</strong> tests ofassumptions <strong>and</strong> goodness-of-fitstatistics. Determine location<strong>and</strong> number of required PIT-tagfacilities.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!