13.07.2015 Views

columbia river basin fish and wildlife program annual ...

columbia river basin fish and wildlife program annual ...

columbia river basin fish and wildlife program annual ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

I. COMPLETED PROJECTSNone.II. FY 1990 ONGOING PROJECTSPROJECTNUMBERTITLEPROJECT STATUSSCHEDULE AND MILFSTONFS83-465 Quantification of Hungry HorseReservoir Levels Needed toMaintain or Enhance ReservoirFisheries - MDFWPProiect Officer: D. JohnsonQbiectives: 1. To study theeffects of reservoir drawdown.2. To develop a predictivemodel of hydro operations onresident <strong>fish</strong>eries, <strong>and</strong> recommendseasonal drawdown levelscompatible with the needs ofthe <strong>fish</strong>.Date initiated: April 1, 1983Results/Conclusions: Reservoir drawdownhas adverse effects on benthic macroinvertebrates<strong>and</strong> zooplankton, can increasecompetition between <strong>fish</strong>, <strong>and</strong>makes juveniles more accessible topredators. Fall drawdown is particularlydamaging to cutthroat growth rates.1. June 30, 1990: Biological model for thereservoir will be completed <strong>and</strong> runs will bemade concurrently with the Systems AnalysisModel. The biological model has beencritically reviewed <strong>and</strong> will be improvedby researchers at the University of Washington.83-467 Quantification of LibbyReservoir Levels Needed toMaintain or Enhance ReservoirFisheries - MDFWPmeet Officer: 0. JohnsonQbiectivel: 1. To study theeffects of reservoir drawdown.2. To develop a predictivemodel of hydro operations onresident <strong>fish</strong>eries, <strong>and</strong> recommendseasonal drawdown levelscompatible with the needs ofthe <strong>fish</strong>.m~nitiated: April 1, 1983 1. June 30, 1990: Biological model for thereservoir will be completed <strong>and</strong> runs will beResults/Conclusions: Gill net sampling made concurrently with the Systems Analysisindicates fluctuations in kokanee Model. The biological model has beennumbers. The reservoir model now in- critically reviewed <strong>and</strong> will be improved byeludes a hydrologic component downstream researchers at the University of Washington.to Duncan <strong>and</strong> Corra Linn dams.2. Work on <strong>fish</strong> entrainment through theLibby Dam penstocks <strong>and</strong> effects of operationson the <strong>river</strong> <strong>fish</strong>ery will begin in FY 1990to increase utility of the reservoir model.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!