13.07.2015 Views

columbia river basin fish and wildlife program annual ...

columbia river basin fish and wildlife program annual ...

columbia river basin fish and wildlife program annual ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

PROJECT11 uNUMBER PO - PM TITLE/OBJECTIVECONTRACT TERMSTART RENEWALPROJECT STATUS DATE DATEIII.PASSAGE AND HABITAT IMPROVEMENTWillamette RiverKlackamas River Sub<strong>basin</strong>84-11 RDS Clackamas/Hood River Habitat Enhancement - Mt. Hood NFCollawash River Falls Passage SubprojectUbiective: Construct a <strong>fish</strong>way to correct CollawashFalls passage problems. The falls prevent accessto potential spawning <strong>and</strong> rearing habitat.Jmorovement: Structure <strong>and</strong> passage10 Habitat: milesSpring Species: chinook,<strong>and</strong> cohowinter <strong>and</strong> summer steelhead,Benefit: Increase of 55,532 smolts <strong>and</strong> 2,957 adults.FY 88 activities included excavation 4/l/84of the <strong>fish</strong>way channel in the bedrockat the falls. Final implementationof improved passage was provided inFY 90 by blasting rocks to reducethe falls gradient. O&M in FY 91.4/l/91Collawash River Drainage Habitat Improvement: HotSprings Fork Subdrainages SubprojectObjective: Install instream structures to improvespawning habitat <strong>and</strong> effective cover.Imorovement: Instream structureHabitat: 10.6 milesSoecies: Winter <strong>and</strong> summer steelhead, spring chinook<strong>and</strong> coho salmonBenefit: 7,249 coho smelts; 2,616 chinook smolts; <strong>and</strong>4,229 steelhead smelts.Instream structure construction willcontinue in FY 91 along with O&M ofpast projects.l/PO = Project Officer: RJA/R. Austin, JAB/J. Bauer, DEJ/D. JohnsonZ/PM = Project Manager: SML/S. Levy, JGM/J. Marcotte, RDS/R. Stoots

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!