13.07.2015 Views

columbia river basin fish and wildlife program annual ...

columbia river basin fish and wildlife program annual ...

columbia river basin fish and wildlife program annual ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

PROJECT11 21NUMBER PO - PMCONTRACT TERMSTART RENEWALTITLE/OBJECTIVE PROJECT STATUS DATE DATE89-24-1 JAB Passage Facility Evaluation <strong>and</strong> URB Adult Fish MonitoringQbiectives: Evaluate loss of juvenile <strong>fish</strong> due topassage through or over WEID Canal screens. Monitorpassage of adult salmon <strong>and</strong> steelhead at Three MileDam.Species: Summer steelhead, spring <strong>and</strong> fall chinookFY 1990: Evaluate WEID Canal screen 9/89<strong>and</strong> adult passage at Three Mile Dam---87-416 & JGM87-416-1Cold Springs (87-416-l) <strong>and</strong> Maxwell (87-416) Divers ionImprovement - USBRQbiectives: Improve passage up <strong>and</strong> downstreamat Cold Springs <strong>and</strong> Maxwell diversions. Improvemen tsinclude <strong>fish</strong>ways <strong>and</strong> canal screens.Imorovement: PassageSoecies: Summer steelhead, spring <strong>and</strong> fall chinook.All construction complete. USBR 7/87turned projects over from constructionto O&M in April 1990. EPA isfunding O&M under an O&M contractwith USBR. The contract term isindefinite.O&M isongoing87-104-Z JGMWestl<strong>and</strong> Non-Fish ImprovementsObiectives: To install improvements on Westl<strong>and</strong>irrigation system that will allow <strong>fish</strong> passagefacilities to operate as intended.Jmorovement: PassageSpecies: Steelhead <strong>and</strong> chinook.Contract in place with Westl<strong>and</strong> 3/90Irrigation District. Predesign tobe completed by June 1990. Finaldesign to be completed by end ofsummer 1990, <strong>and</strong> construction to becompleted by end of fall 1990.l/PO = Project Officer: RJA/R. Austin, JAB/J. Bauer, DEJ/D. Johnsonz/PM = Project Manager: SML/S. Levy, JGM/J. Marcotte, RDS/R. Stoots

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!