13.07.2015 Views

columbia river basin fish and wildlife program annual ...

columbia river basin fish and wildlife program annual ...

columbia river basin fish and wildlife program annual ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

CONTRACT TERMPROJECT11 21 START RENEWALNUMBER PO - PM TITLE/OBJECTIVE PROJECT STATUS DATF DATE87-112 SML Orofino Creek Passage - Consultant A biological/engineering feasibility 6/24/87 --.-. .lectlve: Construct <strong>fish</strong> passage facility to correctpassage problems resulting from Orofino Falls.Imorovement: PassageHabitat: 62 milesSpecies: Summer steelheadBenefit: 12,718 steelhead smoltsstudy was completed in FY 1989.The Project TWG requested a review ofthe cost estimates for the alterna-tives in the engineering feasibil-ity report <strong>and</strong> additional conceptualdesign of lower-cost trap-<strong>and</strong>-haulfacilities. BPA's engineering consultantcompleted this task inOctober 1989. Further implementationhas been deferred to a future FYbeyond FY 91.CDCDSalmon River Sub<strong>basin</strong>84-23 SML Camas Creek. Idaho - USFS/Salmon NFUbiective: Improve riparian conditions to increasesalmon <strong>and</strong> steelhead spawning <strong>and</strong> rearing potential.Imorovement: Fencing <strong>and</strong> riparian revegetation3 Habitat: milesSpecies: Spring chinook <strong>and</strong> steelheadBenefit: Smolt AdulSteelhead 4,586 76Chinook 24,570 128Fencing <strong>and</strong> revegetation completed 6/29/84 9/01/91in FY 1989. Monitoring willcontinue in FY 1990.l/PO = Project Officer: RJA/R. Austin, JAB/J. Bauer, DEJ/D. Johnsonz/PM = Project Manager: SML/S. Levy, JGM/J. Marcotte, RDS/R. Stoots

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!