08.11.2020 Views

The Rampart, The Traffic Artery, and the Park; Designing for the city regions of Antwerp

Through a close reading of Antwerp’s current spatial and socio-economic composition, and the introduction of the interplay between the city’s three defining paradigms – abstracted to ‘The Rampart, the Traffic Artery, and the Park’ – this study tries to sketch a unifying strategy for Antwerp’s metropole. A strategy that embeds residential, economic, cultural, recreational, climatic, and historical motives within the different city regions. Thereby improving the connection between the left and right side of the river; transitioning the suburban region to a more polycentric structure while maintaining a spatial relation to the city; and explicitly manages the horizontal growth of the periphery. But that most importantly, captures the metropole in a single narrative from its inner-city to its outer edges. Graduation thesis prepared for the master’s degree in urban design at the Eindhoven University of Technology.

Through a close reading of Antwerp’s current spatial and socio-economic composition, and the introduction of the interplay between the city’s three defining paradigms – abstracted to ‘The Rampart, the Traffic Artery, and the Park’ – this study tries to sketch a unifying strategy for Antwerp’s metropole. A strategy that embeds residential, economic, cultural, recreational, climatic, and historical motives within the different city regions. Thereby improving the connection between the left and right side of the river; transitioning the suburban region to a more polycentric structure while maintaining a spatial relation to the city; and explicitly manages the horizontal growth of the periphery. But that most importantly, captures the metropole in a single narrative from its inner-city to its outer edges.

Graduation thesis prepared for the master’s degree in urban design at the Eindhoven University of Technology.

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

I I

I

I

I

I

I I

I I

I I

I I

I I

I

I

I

I

I I

I

I

I

I

I

I

I

I

en

To the

harbour

and Luchtbal.

To

Roosendaal

I I I I I I I I I I I I I I I I I I I I I I I I I I I

I I I I I I I

I I I I I I I I I I I I I I I I I I I I

I

I I I I I I I

I

I

I I

I I I I I I I I I I I I I I I

I I I

I I I

I I

I I I I I I I I I I I I

I I

I

To the

harbour

I I I I I I I I I I I I I I I I I

Chaussee to

Bergen op Zoom

I

I I I I I I I I I I

I I I I I I

Chaussee

to Breda

I I I I I I I I I I I I I I I I I I I I

I I I I I I I

I I I

I I I

I I I I I I I

This is the route of the planned

A102, the tunnel that is going to

lead the through traffic around

the city. The tunnel is also going

to include the new railway con

nectiong to the harbour. This

route was originally part of the

R2.

I I I I I I I

E19 to

Breda.

There is also no mention

of a possible role for the

(underground part) of the

planned A102 in the

polycentric plans of the

city.

To

Breda

(railway)

to Brecht

This is a proposed route for a tramline on top

of the Krijgsbaan, part of a long-term study plan

of Antwerp. There are no concrete plans as of

yet; the mobility plan of Antwerp simply

mentions that they are going to look into it at

some point in the future as it would lower the

pressure on the public transport in the city

centre.

It is unclear whether the city want to use the

road as a way to cater to their plan to become

a more polycentric city. The city's mobility plan

(2015) for 2030 predates the new Strategic

Spatial Structure Plan of 2018. And as we have

seen in the earlier drawings, the whole

operation is quite politically charged as the

road runs through multiple municipalities. Not to

mention the strong emotional reactions to

earlier plans for an underground highway

and/or railway under the Krijgsbaan.

I I I I I I I I I I I

Chaussee

to turnhout

l

I I I I I I I

There were plans of a

connection with the

dropped due to protests

and capacity issues.

I I I

I I I I I

I I I

I I

I I I

I I I I

I I I I I

I I I I I I I I I I I I I I I I

I

I

I

I

I

I

I

I

I

I I

I

I I I I I

I I I I I I I I I I I I I

The new tramline along

the ring here will greatly

increase the accessibility of

the amenities along the ring.

To Nijlen

These dots represent

the three different

variants for the second

harbour railway.

the E34 to

Eindhoven

and Maastricht.

I I I I I I I I I

I

I I I

I I I I

I

I I I I I

I

I

I I I

I

I I I

I I

I I I I I I I I

I

I

I I I I I I I I I I I I I I I I I I I I I I I I I

I I I

I I I

I I I

I I I

I I I I I I I I I I I I I

I I I I I I I I I I I I I I I I

I I I I

I I

I

I I I I I I I I I I

I

I

I

I I I

E19 to

Brussels.

I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I

I I I I I I I I I I I I I I I I

bility

ntions

ble new

re.

To Nijlen

The mobility

plan mentions

a possible new

P+R here.

The travel time visualisations show the

clear monocentric structure of Antwerp.

The public transport system of trams and

buses, and even the system of bicycle

highways are designed to get commuters

to and from the city, getting to other parts

of the suburbs, or to other economical focal

points, takes longer then 30 minutes.

I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I

Chaussee

to Mechelen

I I I I I I I I I I I I I I I I I I I I I

Chaussee

to Lier

I I I

Chaussee

to Mechelen

To Mechelen

and Brussels

To Lier

Chaussee

to Lier

145

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!