28.01.2013 Views

LCLS Conceptual Design Report - Stanford Synchrotron Radiation ...

LCLS Conceptual Design Report - Stanford Synchrotron Radiation ...

LCLS Conceptual Design Report - Stanford Synchrotron Radiation ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

12.8 References<br />

L C L S C O N C E P T U A L D E S I G N R E P O R T<br />

1 R. Ruland, Magnet Support and Alignment, in H. Winick, Editor, <strong>Synchrotron</strong> <strong>Radiation</strong> Sources–A<br />

Primer, pp. 274 – 304, World Scientific, 1994<br />

2 R. Ruland, Setting Reference Targets, in Proceedings of the CERN Accelerator School on<br />

“Measurement and Alignment of Accelerator Magnets,” Capri, 1997, CERN 98-05<br />

3 R. Ruland et al., VISA Undulator Fiducialization and Alignment, in: Proceedings of the Sixth<br />

International Workshop on Accelerator Alignment, Grenoble – ESRF, 1999<br />

4 H. Imfeld et al., The Pellissier H5 Hydrostatic Level, in Proceedings of the Fifth International<br />

Workshop on Accelerator Alignment, Chicago–Argonne National Laboratory, 1997<br />

5 W. Schwarz et al., Development of a HLS for the Upcoming Realization of the Linear Collider TESLA<br />

at DESY, to be presented at the 7 th International Workshop on Accelerator Alignment, Spring-8,<br />

Japan, November 2002<br />

6 W. Schwarz, Straightness Measurements with Stretched Wire Technique for Planned Linear Colliders,<br />

to be presented at the 7 th International Workshop on Accelerator Alignment, Spring-8, Japan,<br />

November 2002<br />

7 J. Prenting et al., TESLA - The Range of Survey and Alignment Work, to be presented at the 7 th<br />

International Workshop on Accelerator Alignment, Spring-8, Japan, November 2002<br />

8 Hamar Lasersystems, Model L-723 Triple Scan® Laser with Model A-517 Scan Target.<br />

9 R. Ruland, Accelerator and Transport Line Survey and Alignment, invited talk at the 5 th ICFA Beam<br />

Dynamics Workshop, Corpus Christi, Texas, 1991, SLAC-Pub 5672 pp. 9-14<br />

10 F. Peters, private communication<br />

11 R. Assmann et al., Beamline Stability Measurements with a Stretched Wire System in the FFTB, in<br />

Proceedings of the XVIII International Linac Conference (LINAC 96), Geneva, Switzerland, 1996,<br />

SLAC-Pub-7303<br />

12 K. Flöttmann, Measurements of Magnet Motion at the FFTB with the Wire Alignment System, Internal<br />

<strong>Report</strong>, DESY M 96-07<br />

13 A. Medvedko, Slow Ground Motion Measurement System for the Next Linear Collider Project,<br />

Preliminary <strong>Design</strong> <strong>Report</strong>, Butker Institute of Nuclear Physics, Novosibirsk, Russia, 2001.<br />

A L I G N M E N T♦ 12-19

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!