L C L S C O N C E P T U A L D E S I G N R E P O R T<br />

Assurance and Construction Inspection Procedure (SLAC-I-770-0A22C-001-R003).<br />

Responsibilities of UTRs or Project Engineers include, but are not limited to:<br />

• Apprising subcontractors of SLAC and DOE safety criteria prior to construction.<br />

• Informing subcontractors of the hazards routinely found at SLAC.<br />

• Conducting periodic inspections of subcontractor construction areas to evaluate the<br />

quality of the subcontractor's safety compliance program and quality of work.<br />

• Providing information to SLAC Citizen Safety Committees as required or requested.<br />

• Communicating and resolving safety or quality deficiencies identified by SLAC<br />

personnel with the subcontractor.<br />

• Receiving subcontractor accident reports and compiling information for reporting to<br />

the DOE.<br />

Enforcement of subcontractor requirements is carried out by the SLAC Purchasing<br />

Department and may involve with holding payment(s) if applicable codes and standards are<br />

not met.<br />

13.5.2 Tunnel<br />

The <strong>LCLS</strong> configuration provides for two experimental areas (near and far hall), joined<br />

by a tunnel housing that contains the beam transport line. Early discussions and review of the<br />

tunnel portion of the project, helped determine the need for two separate tunneling<br />

techniques. Both of which may be required during construction. The two techniques that may<br />

be used include: “cut and cover”, which in essence is akin to trenching but on a much larger<br />

scale; and the use of tunnel boring equipment, for those portions of the beamline housing that<br />

cut and cover would be either technically or economically infeasible. While both of these<br />

methods have been used at SLAC for previous projects, they are infrequent operations and<br />

the hazards encountered are not familiar ones to the SLAC community. Accordingly the<br />

safety scope of this type of operation is well defined in both: the California Code of<br />

Regulations, Chapter 4. Division of Industrial Safety, Subchapter 20, Tunnel Safety Orders,<br />

and Title 30, Code of Federal Regulations, “Mineral resources,” Subchapter I Mine safety<br />

and Health Administration, Department of Labor. Subcontractors with mine safety expertise<br />

and experience will be used to provide the tunneling service.<br />

13.6 Hazardous Materials<br />

During the installation and operation phases of the <strong>LCLS</strong> it is anticipated that a minimum<br />

amount of hazardous materials will be used, examples would be paints, epoxies, solvents, oils<br />

and lead in the form of shielding, etc. There are no current or anticipated activities at the<br />

13-10 ♦ E N V I R O N M E N T , S A F E T Y A N D H E A L T H A N D Q A