HEADING PAGE - port of ploce authority * welcome
HEADING PAGE - port of ploce authority * welcome
HEADING PAGE - port of ploce authority * welcome
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
ENVIRONMENTAL IMPACT STUDY<br />
Rn: 03-033 CONTAINER TERMINAL PLOCE <strong>PAGE</strong>: 2<br />
A.4.1 FUNCTION OF PLANNED INTERVENTION<br />
With the construction <strong>of</strong> the container terminal Ploce the following will be<br />
achieved:<br />
A.4.2 SPATIAL NEEDS<br />
- new wharf (dock) length 300 m to serve for access <strong>of</strong> ships <strong>of</strong> the<br />
highest maritime requirements up to maximum deadweight <strong>of</strong> 60.000<br />
DWT and deep draught without limit. On the planned wharf (dock) at<br />
the simultaneous berthing <strong>of</strong> either one ship <strong>of</strong> the above mentioned<br />
maximum deadweight or two ships <strong>of</strong> half <strong>of</strong> the maximum deadweight<br />
requirement.<br />
- new storage and handling surfaces <strong>of</strong> about 15.4 ha to be used for the<br />
needs <strong>of</strong> the container terminal, capacity about 100.000 TEU/year.<br />
The refurbished container terminal will be covering the total surface <strong>of</strong><br />
154.000 m² (15.4 ha) onshore and 53,000 m² (5.3 ha) sea water, i.e. gross<br />
surface 209,000 m² (21 ha).<br />
1. Statement <strong>of</strong> main surfaces<br />
- Port operations surfaces 86.000 m²<br />
- Waterfront with onshore surface 17.000 m²<br />
- Roads and infrastructure structures 24.000 m²<br />
- Warehouse space 12.000 m²<br />
- Auxiliary structures 15.000 m²<br />
- Total surface <strong>of</strong> pier 154.000 m²<br />
(<strong>of</strong> that roads and operative surfaces cover 127.000 m²)<br />
- Aquatic waters (sea) 53.000 m²<br />
2. Pier capacity<br />
RIJEKAPROJEKT d.o.o.<br />
Grand total 209.000 m²<br />
- container terminal 100.000 TEU/year<br />
3. Number <strong>of</strong> employees (evaluation) 40<br />
The pier capacity and the number <strong>of</strong> employees (data elaborated in many<br />
studies) are subject to change and will depend on <strong>port</strong> modernization process<br />
and dynamics <strong>of</strong> implementation <strong>of</strong> modern technologies.