02.04.2013 Views

HEADING PAGE - port of ploce authority * welcome

HEADING PAGE - port of ploce authority * welcome

HEADING PAGE - port of ploce authority * welcome

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

ENVIRONMENTAL IMPACT STUDY<br />

Rn: 03-033 CONTAINER TERMINAL PLOCE <strong>PAGE</strong>: 2<br />

A.4.1 FUNCTION OF PLANNED INTERVENTION<br />

With the construction <strong>of</strong> the container terminal Ploce the following will be<br />

achieved:<br />

A.4.2 SPATIAL NEEDS<br />

- new wharf (dock) length 300 m to serve for access <strong>of</strong> ships <strong>of</strong> the<br />

highest maritime requirements up to maximum deadweight <strong>of</strong> 60.000<br />

DWT and deep draught without limit. On the planned wharf (dock) at<br />

the simultaneous berthing <strong>of</strong> either one ship <strong>of</strong> the above mentioned<br />

maximum deadweight or two ships <strong>of</strong> half <strong>of</strong> the maximum deadweight<br />

requirement.<br />

- new storage and handling surfaces <strong>of</strong> about 15.4 ha to be used for the<br />

needs <strong>of</strong> the container terminal, capacity about 100.000 TEU/year.<br />

The refurbished container terminal will be covering the total surface <strong>of</strong><br />

154.000 m² (15.4 ha) onshore and 53,000 m² (5.3 ha) sea water, i.e. gross<br />

surface 209,000 m² (21 ha).<br />

1. Statement <strong>of</strong> main surfaces<br />

- Port operations surfaces 86.000 m²<br />

- Waterfront with onshore surface 17.000 m²<br />

- Roads and infrastructure structures 24.000 m²<br />

- Warehouse space 12.000 m²<br />

- Auxiliary structures 15.000 m²<br />

- Total surface <strong>of</strong> pier 154.000 m²<br />

(<strong>of</strong> that roads and operative surfaces cover 127.000 m²)<br />

- Aquatic waters (sea) 53.000 m²<br />

2. Pier capacity<br />

RIJEKAPROJEKT d.o.o.<br />

Grand total 209.000 m²<br />

- container terminal 100.000 TEU/year<br />

3. Number <strong>of</strong> employees (evaluation) 40<br />

The pier capacity and the number <strong>of</strong> employees (data elaborated in many<br />

studies) are subject to change and will depend on <strong>port</strong> modernization process<br />

and dynamics <strong>of</strong> implementation <strong>of</strong> modern technologies.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!