ENVIRONMENTAL IMPACT STUDY<br />

Rn: 03-033 CONTAINER TERMINAL PLOCE <strong>PAGE</strong>: 2<br />

D.2.1. OVERVIEW OF POSSIBLE ENVIRONMENTAL IMPACTS DURING<br />

CONSTRUCTION<br />

D.2.1.1 ON LAND<br />

D.2.1.2 ON SEA<br />

With selected method <strong>of</strong> construction <strong>of</strong> coastal areas, by dredging the sea<br />

bottom between the Quay 5 (existing) and Quay 7 (new) the environmental impact<br />

during construction is partially reduced. The work in stages and the lengthiness <strong>of</strong><br />

construction according to the chosen concept and the technology <strong>of</strong> building,<br />

does not bring about the additional environmental impacts.<br />

Because <strong>of</strong> construction work mud silting <strong>of</strong> the sea shall occur, especially during<br />

deepening <strong>of</strong> the local waters for achieving the necessary depth <strong>of</strong> the <strong>port</strong> basin.<br />

Increased quantity <strong>of</strong> suspended matter in the water column shall be reflected in<br />

reduced quantity <strong>of</strong> light needed by algae for assimilation. Since all this is taking<br />

place on already degraded sea bottom, new activities shall not (further) degrade<br />

the current state.<br />

RIJEKAPROJEKT d.o.o.