ENVIRONMENTAL IMPACT STUDY<br />
Rn: 03-033 CONTAINER TERMINAL PLOCE <strong>PAGE</strong>: 4<br />
D.3.2. ENVIRONMENTAL PROTECTION MEASURES DURING<br />
CONSTRUCTION<br />
D.3.2.1. REDUCTION OF NEGATIVE EFFECTS OF NOISE<br />
Implement measures for protection against effects <strong>of</strong> increased noise level:<br />
• Obtaining <strong>of</strong> opinion and approval from the competent inspection<br />
authorities for all construction works which by nature <strong>of</strong> their<br />
technological procedure and process have to be carried out continually<br />
during the day and night (and holiday).<br />
• Restriction <strong>of</strong> daily execution <strong>of</strong> works, primarily from 6 to 23 hours.<br />
• In the construction stage, the contractor has to meet the general<br />
measures <strong>of</strong> project location protection against spreading <strong>of</strong> site noise<br />
(restriction <strong>of</strong> emitted sound power which the contractor’s equipment is<br />
allowed to have).<br />
• The contractor is under obligation to prepare the site organization<br />
schedule with clear and articulate bill <strong>of</strong> quantities and specifications for<br />
implementation <strong>of</strong> environmental protection measures according to<br />
established criteria which will have to be met during construction, all in<br />
accordance with regulations, conventions and other provisions.<br />
• Supervision during execution <strong>of</strong> works, not only the technical<br />
supervision, but also periodical or permanent supervision by inspection<br />
authorities during noise measurements performed by authorized<br />
companies.<br />
• Cooperation with trans<strong>port</strong> companies which will perform trans<strong>port</strong><br />
both on arrival and departure, should be conditioned to include the most<br />
modern trans<strong>port</strong> means (both road and railway ones).<br />
D.3.2.2. REDUCTION OF NEGATIVE EFFECTS OF WASTE<br />
Implement measures for protection against effects <strong>of</strong> waste during<br />
construction:<br />
• Packaging waste should be collected separately and distinctly marked.<br />
• Municipal and other similar waste should be collected in specialpurpose<br />
containers and regularly trans<strong>port</strong>ed.<br />
D.3.2.3. REDUCTION OF NEGATIVE EFFECTS OF SEA EXCAVATION<br />
Material obtained by submarine excavation for deepening <strong>of</strong> the <strong>port</strong> basin<br />
between Quay 5 and Quay 7 should be disposed <strong>of</strong> in <strong>port</strong> area, on the<br />
location <strong>of</strong> the container terminal and on areas designed for further <strong>port</strong><br />
development.<br />