HEADING PAGE - port of ploce authority * welcome
HEADING PAGE - port of ploce authority * welcome
HEADING PAGE - port of ploce authority * welcome
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
ENVIRONMENTAL IMPACT STUDY<br />
Rn: 03-033 CONTAINER TERMINAL PLOCE <strong>PAGE</strong> 2<br />
C.3.1. SEA<br />
During the construction and later the use <strong>of</strong> the terminal, it shall be necessary<br />
to monitor the state <strong>of</strong> the environment for timely discovering <strong>of</strong> possible<br />
unfavourable and undesirable impacts so that additional measures <strong>of</strong><br />
environment protection could be applied. The following environment<br />
monitoring program is proposed:<br />
C.3.1.1. After the construction <strong>of</strong> the facility, the state <strong>of</strong> life communities in the<br />
existing transects should be monitored in the years to come and the obtained<br />
results should be compared with those obtained before the construction.<br />
Regular controls should be carried out every four years for continuous<br />
monitoring <strong>of</strong> the macrobenthonic organisms colonization process and<br />
recovery <strong>of</strong> bottom-dwelling communities in the transect PL-01 I PL-02.<br />
C.3.1.2. Testing the waste water quality at the outlet <strong>of</strong> the treatment plant SZV 1<br />
for oily water coming from the machine maintenance plant shall be<br />
performed four times a year by the laboratory authorized for water quality<br />
testing (Rule on authorized laboratories, OG No. 78/97. The analysis shall<br />
include the determination <strong>of</strong> the following:<br />
• pH,<br />
• total suspended matter,<br />
• chemical oxygen consumption,<br />
• biochemical oxygen consumption,<br />
• overall and mineral oils,<br />
• anionized and unionized detergents.<br />
C.3.1.3 Testing <strong>of</strong> water quality at the outlet <strong>of</strong> the grease trap – sedimentation<br />
chamber SOK 1 and SOK 2, precipitation sewers, shall be performed four<br />
times a year. The analysis shall include the following:<br />
• pH,<br />
• total suspended matter,<br />
• chemical oxygen consumption,<br />
• biochemical oxygen consumption,<br />
• overall and mineral oils.<br />
C.3.1.4 Testing <strong>of</strong> sea water quality shall be carried out on two stations:<br />
• KV 1 within the basin between coast 5 and coast 7<br />
• KV 2 at the basin outlet between the coast 5 and coast 7<br />
two times during summer months in bottom-dwelling and surface sea<br />
layer.<br />
The following indexes <strong>of</strong> water quality should be determined:<br />
• clearness<br />
• temperature<br />
• salinity<br />
• dissolved oxygen<br />
• PH<br />
• mineral oils,<br />
RIJEKAPROJEKT d.o.o.