02.04.2013 Views

HEADING PAGE - port of ploce authority * welcome

HEADING PAGE - port of ploce authority * welcome

HEADING PAGE - port of ploce authority * welcome

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

ENVIRONMENTAL IMPACT STUDY<br />

Rn: 03-033 CONTAINER TERMINAL PLOCE <strong>PAGE</strong>: 3<br />

3. Sea water quality should be controlled:<br />

• Prior to construction commencement - “zero state”<br />

• During the use every year, twice in summer months from the<br />

bottom and surface layer <strong>of</strong> the sea.<br />

D.4.4. STATE OF SEA BOTTOM SEDIMENTS<br />

1. The place <strong>of</strong> testing:<br />

• at transection PL-01 station PLS-01<br />

• na transection PL-02 station PLS-02<br />

2. Test content <strong>of</strong> heavy metals in the sediment surface layer (0-2 cm):<br />

• Lead<br />

• Copper<br />

• Zinc<br />

• Tin<br />

3. Samples should be taken and controlled:<br />

• During the use once a year, every two years.<br />

RIJEKAPROJEKT d.o.o.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!