02.04.2013 Views

HEADING PAGE - port of ploce authority * welcome

HEADING PAGE - port of ploce authority * welcome

HEADING PAGE - port of ploce authority * welcome

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

ENVIRONMENTAL IMPACT STUDY<br />

Rn: 03-033 CONTAINER TERMINAL PLOCE <strong>PAGE</strong>: 2<br />

The procedure <strong>of</strong> evaluation <strong>of</strong> the environmental impact <strong>of</strong> the planned<br />

intervention is carried out during the implementation <strong>of</strong> the project and in the<br />

phase <strong>of</strong> obtaining the location permit on the basis <strong>of</strong> technical documents,<br />

i.e. this Sturdy. The public participates also in the Sturdy evaluation by making<br />

the Sturdy available to them and acquainting them with intended construction<br />

<strong>of</strong> the container terminal as well as with all im<strong>port</strong>ant data concerning<br />

environmental protection. By submitting written opinion, proposals and<br />

remarks, the public participates in the evaluation <strong>of</strong> the intervention as well as<br />

in its implementation <strong>of</strong> the project.<br />

By introducing the monitoring, an active public cooperation shall be<br />

established which should be strengthened by regular public presentation <strong>of</strong><br />

results obtained by measuring the environment quality.<br />

It is proposed that the intervention holder gives a press conference at least<br />

once a year presenting the implemented program to the public as well as its<br />

short and long term plans.<br />

After implementation <strong>of</strong> the intervention and during its exploitation, it would be<br />

appropriate to conduct regularly once a year a poll among the inhabitants,<br />

immediate neighbors inquiring their satisfaction with the achieved state, i.e.<br />

their proposals for its improvement.<br />

In conformity with the notes <strong>of</strong> this Study, we conducted informative talks with<br />

the intervention holder concerning the mode <strong>of</strong> cooperation with the public. In<br />

spite <strong>of</strong> our insistence, we did not succeed in finding out if, and which if<br />

affirmative, systematic steps had been taken for cooperation with the public.<br />

We would like to point out that the intervention holder should disclose its<br />

standpoint very soon and present the plan <strong>of</strong> cooperation and its<br />

implementation.<br />

RIJEKAPROJEKT d.o.o.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!