ENVIRONMENTAL IMPACT STUDY<br />

Rn: 03-033 CONTAINER TERMINAL PLOCE <strong>PAGE</strong>: 5<br />

Until the problem <strong>of</strong> the town <strong>of</strong> Ploce waste water discharge in the <strong>port</strong><br />

acquatorium is solved, i.e. until the 1st phase <strong>of</strong> the city sewage system<br />

reached, the sanitary-sewage water coming from new structures must be<br />

purified in the septic tank and discharged into the ground.<br />

Waste waters resulting from traffic and operative <strong>port</strong> area washing out should<br />

be purified in the oil traps-sedimentation basins.<br />

Waste water at trap outlet must meet the following requirements: suspended<br />

substances 35 mg/L, total oil and grease content 25 mg/L, mineral oil 5 mg/L.<br />

Oil traps are also used for receiving hazardous liquids in the event <strong>of</strong> traffic<br />

and operative area incidents (i.e. spillage <strong>of</strong> fuel).<br />

C.1.1.4. TRAFFIC IMPACT PROTECTIVE MEASURES<br />

C.1.1.4.1. ON LAND<br />

C.1.1.4.2. AT SEA<br />

Prior to the container terminal start-up, the junction road leading from<br />

the Adriatic Highway to <strong>port</strong> industrial zone where the Container<br />

terminal is situated up to the intersection, must be in service. The same<br />

applies to the first phase <strong>of</strong> terminal construction, i.e. the first phase can<br />

be in use only after the junction road was put in service.<br />

The junction road has been approved by the Strategy and space development<br />

program <strong>of</strong> the Republic <strong>of</strong> Croatia, it has been included in the county and city<br />

physical plans and in the construction plan <strong>of</strong> the Hrvatkse Ceste (Croatian<br />

Roads) for the upcoming planning period <strong>of</strong> four years, namely until the year<br />

2004.<br />

Maritime traffic within the Container terminal zone should be regulated<br />

according to the existing maritime traffic laws and regulations and according<br />

to the Maritime Study for Entering and Leaving the Port which elaboration is<br />

mandatory for the new situation in the basin.<br />

C.1.1.5. ENVIRONMENTAL NOISE PROTECTIVE MEASURES<br />

Environmental protection with regard to noise pollution can be implemented<br />

through the following:<br />

C.1.1.5.1. ORGANIZATIONAL MEASURES<br />

Noise protection organizational measures implementation starts with<br />

preliminary technological and architectural and structural designs, continues<br />

with extensive solutions within working designs, then by site organization<br />

projects, by proscribing requirements to be met by the contractors, by designs<br />

<strong>of</strong> certain construction phases and connection with authorized inspection<br />

services, and after the completion <strong>of</strong> construction, by the organization <strong>of</strong> work<br />

technology procedures within the INTERVENTION. If performed in a quality<br />

manner, those works actually represent the least expensive and most<br />

effective environmental noise protection measures.<br />

RIJEKAPROJEKT d.o.o.