02.04.2013 Views

HEADING PAGE - port of ploce authority * welcome

HEADING PAGE - port of ploce authority * welcome

HEADING PAGE - port of ploce authority * welcome

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

ENVIRONMENTAL IMPACT STUDY<br />

Rn: 03-033 CONTAINER TERMINAL PLOCE <strong>PAGE</strong>: 6<br />

• All vehicles entering and leaving the zone <strong>of</strong> the new container terminal<br />

have to be equipped according to applicable laws.<br />

• All ships putting in at the <strong>port</strong> <strong>of</strong> Ploce for the container terminal must<br />

comply with the provisions <strong>of</strong> applicable laws.<br />

• Before putting into use <strong>of</strong> the stage II <strong>of</strong> the construction <strong>of</strong> the Container<br />

terminal in the <strong>port</strong> <strong>of</strong> Ploce, the connection road leading from the <strong>port</strong><br />

entrance to the Adriatic highway has to be operational. The same applies to<br />

the stage I <strong>of</strong> the construction <strong>of</strong> the wharf when the capacity <strong>of</strong> 40,000<br />

TEU/year has been reached, i.e. the first stage can be utilized to the full<br />

capacity only when the connection road is fully operational.<br />

RIJEKAPROJEKT d.o.o.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!