HEADING PAGE - port of ploce authority * welcome
HEADING PAGE - port of ploce authority * welcome
HEADING PAGE - port of ploce authority * welcome
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
ENVIRONMENTAL IMPACT STUDY<br />
Rn: 03-033 CONTAINER TERMINAL PLOCE <strong>PAGE</strong>: 12<br />
B.2.4.4 NOISE<br />
measures applied during the reloading <strong>of</strong> mineral oils (floating barriers). These<br />
Guidelines have not been agreed upon with the Harbour Authority.<br />
B.2.4.4.1 SOURCES OF NOISE DURING THE STRUCTURE UTILIZATION<br />
The new container terminal will enable the annual reloading efficiency <strong>of</strong> ca.<br />
100000 TEU.<br />
Containers will be delivered into and dispatched from the <strong>port</strong> on ships <strong>of</strong><br />
60000 DWT. One ship <strong>of</strong> this size can berth quayside.<br />
An estimated 60% <strong>of</strong> the total cargo will be trans<strong>port</strong>ed by rail and the<br />
remaining 40% by trucks.<br />
The existing accesses to the classification station Ploce and further into the<br />
inland will be used for the loading and trans<strong>port</strong>ation activities.<br />
Trucks will be using the existing access road from the Adriatic main road<br />
(Jadranska magistrala). Within the <strong>port</strong>, existing roads will be used.<br />
Sources <strong>of</strong> noise spreading within the construction site and impact area are:<br />
A) TRANSPORTATION MEANS<br />
- Loading/unloading ships<br />
- Entering/departing trucks<br />
- Entering/departing trains<br />
B) DOCK MACHINERY<br />
- Cranes and container bridges<br />
- Transtainers<br />
- Tractors with trailers<br />
- Container trans<strong>port</strong>ers<br />
- Other equipment, devices and installations<br />
B.2.4.4.2 TRANSPORTATION MEANS<br />
A) LOADING/UNLOADING SHIPS<br />
It has been mentioned that containers will be delivered into and dispatched<br />
from the <strong>port</strong> on ships <strong>of</strong> max. 60000 DWT and that one ship <strong>of</strong> this size can<br />
berth quayside.<br />
According to the present regulations in the developed countries (Germany,<br />
Sweden, Canada), ships must meet strict criteria with respect to the noise<br />
during the entering/departing maneuvers and the operations during the stay in<br />
the <strong>port</strong> (loading/unloading).<br />
Therefore, ships mooring into the container terminal area must meet following<br />
conditions:<br />
RIJEKAPROJEKT d.o.o.