ENVIRONMENTAL IMPACT STUDY<br />

Rn: 03-033 CONTAINER TERMINAL PLOCE <strong>PAGE</strong>: 8<br />

C.1.2. PROPOSED ENVIRONMENTAL PROTECTIVE MEASURES DURING<br />

THE PHASE OF CONSTRUCTION<br />

C.1.2.1. EXCESSIVE NOISE PROTECTIVE MEASURES IN THE EVENT OF<br />

SITE OPENING AND CONSTRUCTION PURSUANT TO THE NOISE<br />

PROTECTION ACT (OG No. 17/1990.)<br />

This act regulates noise protection requirements for the INTERVETNION<br />

IMPACT AREA in the event <strong>of</strong> site opening, construction and<br />

exploitation <strong>of</strong> the PROJECT.<br />

The above mentioned act governs the contractor liability on the<br />

CONSTRUCTION SITE to PROVIDE FOR AND IMPLEMENT noise<br />

expansion protective measures, exceeding the permissible levels, and to<br />

monitor the implementation <strong>of</strong> the measures within the framework <strong>of</strong> site<br />

development plan.<br />

In accordance with this act, construction works shall be executed on everyday<br />

basis, in the period from 6 to 23 o’clock.<br />

For construction works, which have to be executed incessantly by day and<br />

night (as well as on holidays) due to the nature <strong>of</strong> their technological<br />

procedure, the opinion and approval by the competent inspection service shall<br />

be filed for.<br />

Contractor must comply with the general noise protective measures for the<br />

intervention location <strong>of</strong>f the site. The general environmental noise protective<br />

measures <strong>of</strong>f the site imply the following:<br />

• ESTABLISHING CRITERIA TO BE MET BY THE CONTRACTOR<br />

DURING CONSTRUCTION (limits for emitted sound force allowed for the<br />

constructor’s equipment).<br />

• CONTRACTOR’S LIABILITY TO COMPILE THE SITE DEVELOPMENT<br />

PLAN, AS WELL AS THE WORK PLAN INCLUDING A PRECISE COST<br />

ESTIMATE AND WORK, MATERIAL, PROCEDURES AND<br />

RESTRICTIONS SPECIFICATIONS, WHICH SHALL ENSURE IN A<br />

CLEAR AND COMPREHENSIVE MANNER THE CONSTRUCTOR’S<br />

MAKING OF A UNAMBIGUOUS AND CLEAR OFFER WITH ACCEPTED<br />

LIABILITIES.<br />

• SUPERVISION DURING WORK EXECUTION (not only technical<br />

supervision, but also occasional or constant monitoring by inspection<br />

services or companies authorized for noise measurement).<br />

C.1.2.2. AIR POLLUTION PROTECTIVE MEASURES<br />

Due to the assessment that the vehicles trans<strong>port</strong>ing the dredged material<br />

shall produce a considerable quantity <strong>of</strong> dust during dry period, which shall<br />

cause air pollution (during dry period and strong winds in particular), trans<strong>port</strong><br />

vehicles should be under constant supervision. In case <strong>of</strong> trans<strong>port</strong>ation <strong>of</strong> an<br />

extremely dry, powdery material, the material shall be sprinkled with water<br />

before trans<strong>port</strong>ation.<br />

RIJEKAPROJEKT d.o.o.