ENVIRONMENTAL IMPACT STUDY<br />
Rn: 03-033 CONTAINER TERMINAL PLOCE <strong>PAGE</strong>: 3<br />
During the phase <strong>of</strong> preparation, construction and utilization <strong>of</strong> the <strong>port</strong>, it is<br />
necessary to reduce all possible undesirable environmantal impacts to an<br />
acceptable level by implementation <strong>of</strong> appropriate measures.<br />
C.1.1. PROPOSED ENVIRONMENTAL PROTECTIVE MEASURES DURING<br />
THE PHASE OF PREPARATION<br />
Before issuing preliminary building permit it is necessary to implement the<br />
following:<br />
C.1.1.1 . AIR POLLUTION PROTECTIVE MEASURES<br />
Terms <strong>of</strong> prevention and reducing air pollution by ships should be included in<br />
the Regulation on Port Operation and Requirements for Port Utilization in the<br />
Port Area <strong>of</strong> the Ploce Port, provided they were accepted on both national and<br />
international level.<br />
C.1.1.2. MEASURES RELATING TO REDUCTION OF ENVIRONMENTAL<br />
DAMAGES RESULTING FROM SUDDEN SEA POLLUTION<br />
C.1.1.2.1. Project design for land installations for disposal <strong>of</strong> oily water from ships<br />
in the Ploce Port<br />
In order to be discharged into the sea, waste water coming from the system<br />
treatment device, must meet the following requirements: suspended<br />
substances = 35 mg/L, KPK Cr- = 125 mg O2/L, BPK5 = 25 mgO2/L, total oil<br />
and grease 25 mg/L and mineral oil = 5 mg/L.<br />
C.1.1.2.2. Furnishing <strong>of</strong> a specialized company for waste oil takeover <strong>of</strong>f ships.<br />
A specialized company for pollution control and elimination, performing within<br />
its business activities, waste oil collection from ships as well, must be supplied<br />
with appropriate equipment for waste oil sampling and must stipulate<br />
contracts on testing with the authorized testing laboratory. It is also necessary<br />
to define terms and liabilities <strong>of</strong> this business with the company receiving<br />
waste oil, by means <strong>of</strong> a contract.<br />
C.1.1.2.3. Plan elaboration for the further development <strong>of</strong> system <strong>of</strong> measures<br />
related to environmental damage reduction resulting from sudden<br />
pollutions in the Ploce Port.<br />
The development <strong>of</strong> the system must be performed in such a way as to<br />
enable efficient pollution protection by other hazardous substances as well.<br />
Setting up <strong>of</strong> this system should not be connected with the container terminal<br />
construction. Plans for the further development <strong>of</strong> the <strong>port</strong> should also include<br />
this component.<br />
Conclusion<br />
The set out requirements cannot be connected to the container terminal<br />
construction exclusively. However, in construction <strong>of</strong> this structure, all<br />