ENVIRONMENTAL IMPACT STUDY<br />
Rn: 03-033 CONTAINER TERMINAL PLOCE <strong>PAGE</strong>: 15<br />
Such a new technological organization considerably reduces the internal<br />
traffic in the old part <strong>of</strong> the Ploce Port.<br />
This new organization would not increase the environmental impacts but<br />
rather reduce them. Such a conclusion is based on the fact that the cargo will<br />
be more rationally handled and trans<strong>port</strong>ed, which is precisely the main goal<br />
<strong>of</strong> the new construction.<br />
B.2.4.5.2 ON THE SEA<br />
General characteristics <strong>of</strong> the access navigation path and ships berthing and<br />
lying at berth are:<br />
• Berths are protected from sea currents, wind and waves<br />
• Water around the berths is deep enough for ships to maneuver freely,<br />
so that UKC is not problematic<br />
• Navigation marks along the navigation path and in the berthing area<br />
are all right<br />
• Free area in front <strong>of</strong> the future container terminal is big enough for the<br />
ships <strong>of</strong> the anticipated size to do the necessary maneuver operations<br />
Since the docking in or docking out the basin between Quay 5 and Quay 7 is<br />
considered to be a maneuver, and not free navigation, it can be concluded<br />
that ships lying at anchor at Quay 7 <strong>of</strong> the container terminal will not hinder a<br />
safe passage <strong>of</strong> the ships docking in or out the basin Rijeka.<br />
In terms <strong>of</strong> safe navigation, docking in and out the Quay 7 <strong>of</strong> the container<br />
terminal will at certain times disturb the arrival to/departure from the basin<br />
between Quay 5 and Quay 7. Since tugboats must be used because <strong>of</strong> the<br />
ships’ size, simultaneous maneuvering <strong>of</strong> two ships in this basin will be<br />
forbidden. Exceptions will be allowed in case that real dimensions <strong>of</strong> two<br />
smaller ships intending to do the docking in/out maneuvers are<br />
acknowledged, depending also on hydrological and meteorological conditions.<br />
It can be concluded that the new Quay 7 <strong>of</strong> the container terminal would<br />
affect safe docking in/out the basin between Quay 5 and Quay 7. It will<br />
be necessary to regulate additional proceeding for safe docking in the<br />
basin <strong>of</strong> the Ploce Port.<br />