05.05.2013 Views

APPROVED IDP DOC 2011-16.BA PHALABORWA.pdf

APPROVED IDP DOC 2011-16.BA PHALABORWA.pdf

APPROVED IDP DOC 2011-16.BA PHALABORWA.pdf

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

WARD AFFECTED AREA NATURE OF CHALLENGE INTERVENTION<br />

(Village/Section)<br />

REQUIRED<br />

Mabikiri water connection at RDP standard high level of service with<br />

water meters<br />

Makhushane -<br />

Sebera<br />

Mashishimale R1<br />

- Nguvo<br />

16 Kurhula (New<br />

Extensions)<br />

No water network Water reticulation at RDP<br />

level of service<br />

No water network Water reticulation at RDP<br />

level of service<br />

No water network Water reticulation to RDP<br />

level of service<br />

Lulekani A No sewer, waste water is all over<br />

the area, encouraging mosquitoes’<br />

breeding<br />

Lulekani –<br />

Stadium Ext.<br />

(New planned<br />

sites)<br />

Sewer reticulation should<br />

be provided to well<br />

planned stands<br />

No water network. No sewer. Water and sewer<br />

reticulation to a higher<br />

level of service with<br />

water meters<br />

108<br />

NO. OF HOUSEHOLDS<br />

AFFECTED<br />

ESTIMATED<br />

COST<br />

RESPONSIBLE<br />

ENTITY<br />

400 R2.4m Mopani<br />

100 R0.6 Mopani<br />

528 R3.2m Mopani<br />

2 000 R17.m Mopani<br />

400 R6.0m Mopani

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!