Source: Draft Ba-Phalaborwa SDF<br />

The following are the most common needs associated with municipal roads:<br />

• Stormwater control and culverts<br />

• Regravelling<br />

• Street paving<br />

• Potholes repairs<br />

Each of the highlighted needs is presented separately according to location and estimated cost<br />

Table B.46: Backlog on Stormwater Control and Culverts<br />

WARD LOCATION QTY COST ESTIMATE<br />

1 Makhushane - Nyakelang 1 Struct. R180,000.00<br />

Makhushane - Haniville 2 Struct. R260,000.00<br />

Sub - total R440,000.00<br />

2 Selwane 1 Struct. R70,000.00<br />

Selwane - Mohale 2 Struct. R260,000.00<br />

Sub –total R330,000.00<br />

3 Namakgale Zone D 1 Struct. R50,000.00<br />

Sub – total R50,000.00<br />

4 Matiko-Xikaya 1 Struct. R130,000.00<br />

Sub - total R130,000.00<br />

5 - - -<br />

6 Lulekani 2 Structures R300,000.00<br />

Sub – total R300,000.00<br />

7 Namakgale - T/Mshong 1 Struct. R160,000.00<br />

Namakgale – Top Ville 1 Struct. R130,000.00<br />