The streets prioritized for paving in the population concentration points, as per the table above, are<br />

expected to improve access to government and other services. To achieve this objective, the Municipality<br />

has to pave about 21km of streets at an estimated cost of R24, 000,000.00.<br />

The table below shows Municipal roads that need maintenance (potholes repairs)<br />

Table B.48: Streets per location that need maintenance (Potholes Repairs)<br />

WARD LOCATION QTY COAST ESTIMATE<br />

1 Phalaborwa - CBD<br />

R112,000.00<br />

Sub - total R112,000.00<br />

2 - - -<br />

3 Namakgale Zone A & D<br />

R63,000.00<br />

Sub – total R63,000.00<br />

4 Matiko-Xikaya<br />

R8,400.00<br />

Sub - total R8,400.00<br />

5 Phalaborwa - Bataleur<br />

6 Lulekani<br />

R112,000.00<br />

Sub-total R112,000.00<br />

R63,000.00<br />

Sub – total R63,000.00<br />

7 Namakgale – Zone C<br />

8 Majeje<br />

R14,000.00<br />

Sub- total R14,000.00<br />

R7,000.00<br />

Sub – total R7,000.00<br />

9 - - -<br />

10 Gravelotte<br />

R8,400.00<br />

128