Lulekani<br />

A total of 9.75 km of roads within the township has roadside street lighting installed together with<br />

7 high mast lights providing area lighting. The sports stadium is also equipped with flood lighting.<br />

At a number of identified dangerous intersections street lighting has been installed on an ad-Hoc<br />

basis. There are however many areas, which need to have lighting, installed.<br />

Out Laying Villages<br />

With regard to the out laying villages of the municipal area, street lighting is non-existent. Some of<br />

these villages have not as yet been electrified and therefore no street lighting can be installed.<br />

Solar-based highmast lighting may be a solution.<br />

Table B.40: Number of households without electricity per Ward<br />

1<br />

Ward Area/Location No. of Households Estimated cost 6<br />

Nyakelang 4 225 2250<br />

2 Selwane 89 890<br />

10 Boelang 100 1.000<br />

Maseke/Mashishimale<br />

R1 492 4.920<br />

Gravelotte 392 3.920<br />

11 Maune 11 110<br />

6 Estimations at R10 000, 00 per Household<br />

Ntswelemotse 41 410<br />

Kananana 509 5.090<br />

Garden View 580 5.800<br />

113<br />

R’000