05.05.2013 Views

APPROVED IDP DOC 2011-16.BA PHALABORWA.pdf

APPROVED IDP DOC 2011-16.BA PHALABORWA.pdf

APPROVED IDP DOC 2011-16.BA PHALABORWA.pdf

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Ward Area/Location No. of Households Estimated cost 6<br />

Tipeng 69 690<br />

Boelang & Tselang<br />

Gape 500 500<br />

14 Namakgale Zone 2 1 100 111.000<br />

15 Makhushane 280 2.800<br />

16<br />

Source: Electricity Department 2009<br />

Key issues with regard to electricity supply:<br />

Maseke 81 810<br />

Kurhula / Pondo /<br />

Mlambo 84 840<br />

Total 7355 73.550.000<br />

Lack of street/area lighting in the rural areas promotes crime;<br />

Highmast lights are not properly maintained;<br />

Rates income not enough to cover both capital and operational costs;<br />

114<br />

R’000<br />

LAP information reveal that there are three schools, two in Ward 4 and 1 in Ward 11 that do not<br />

have electricity;<br />

Wards 2, 8, 12, and 13 complain about power cuts by the supplier without prior warnings;<br />

Electricity easily cuts-off during windy and rainy days;<br />

Cable theft, particularly in Wards 9 an 16, is a serious concern to electricity users;<br />

There is an urgent need for refurbishment of old network in Phalaborwa in order to attract<br />

investment.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!